6 Mounting
Maschinenfabrik Reinhausen GmbH 2018
37
5252433/02 EN
ECOTAP
®
VPD
®
CONTROL PRO
6.4.1 Mounting the device using the cap rail included in delivery
The cap rail included in delivery has 3 mounting drill holes, which you can
use to fasten the cap rail to the rear panel of the switch cabinet. Before you
can begin mounting, you have to remove a part of the device.
Figure 15: Overview of the partial removal of assemblies
Preparing the device for mounting
To prepare the device for mounting, proceed as follows:
1. Remove the plug for voltage measurement from the UI assembly.
Figure 16: Removing the plug for voltage measurement
Содержание ECOTAP VPD CONTROL PRO
Страница 1: ...Voltage Regulator ECOTAP VPD CONTROL PRO Operating Instructions 5252433 02 EN ...
Страница 190: ......
Страница 191: ......