
7 Operation
Maschinenfabrik Reinhausen GmbH 2021
79
8209941/00 EN
ECOTAP
®
VPD
®
III 30D-24 / MD&C
To set the B2 bandwidth, proceed as follows:
ü
The AVR MANUAL operating mode is active.
1. Press
>
until the desired parameter is displayed.
ð
2. Press
to confirm the selection.
ð
3. Press
to confirm the selection.
4. Press
or
to select the desired value.
5. Press
to confirm the selection.
6. Press
to save the setting.
7.4.1.5 Delay time T2 (P3.2)
The delay time delays the issuing of a tap-change command for a defined
period. This prevents unnecessary tap-change operations if the tolerance
bandwidth is exited only briefly. Delay time T2 enables a faster response to
larger changes in voltage compared with T1. Note that the setting range is
dependent on the delay time T1:
▪ For T1 ≤ 10 s: T2 = 2 s…(T1 - 1 s)
▪ For T1 > 10 s: T2 = 2 s…(T1 - 5 s)
To set the delay time T2, proceed as follows:
ü
The AVR MANUAL operating mode is active.
1. Press
>
until the desired parameter is displayed.
ð
2. Press
to confirm the selection.
3. Press
until the desired parameter is displayed.
ð
4. Press
to confirm the selection.
5. Press
or
to select the desired value. Alternative: Press
+
or
+
to set the value in larger steps.
6. Press
to confirm the selection.
7. Press
to save the setting.
Содержание ECOTAP VPD 3 30D-24
Страница 131: ......