![MP Aquinity2 P10 Скачать руководство пользователя страница 36](http://html.mh-extra.com/html/mp/aquinity2-p10/aquinity2-p10_user-manual_1842923036.webp)
Care and maintenance
31
should be completed within 24 hours after module replacement or first start.
Replacement of the UV lamp
7.4
Figure 14: UV reactor with UV lamp
-
Turn off the system by unplugging the power adapter out of the electrical outlet
-
Remove the left side panel
-
Loosen the rubbers and remove the UV reactor from the holders
-
Remove the cap from the reactor and remove the UV lamp
-
Attention: Do not touch the glass bulb of the new UV lamp with your fingers!
-
Replace the old UV lamp with the new one and then carefully reinsert it into the UV
reactor
-
Fix everything with the cap and then fix the UV reactor with the rubbers in the
holders.
-
Close the side panel
-
Plug the power adapter into the socket
-
Reset the operating hours counter (see chapter 5.2.2)
UV reactor
Electrical connector
Holder
UV lamp
Cap