
1.
2-Parts Track:
As Fig.6, slide the A rail into the sleeve, slide the B rail into the sleeve.
3-Parts Track:
As Fig.7, slide the C rail into the sleeve, slide the D rail into the sleeve; slide the E rail into the sleeve.
2.
Cut the plastic thread; pull the screw rod along with inner chain to the end rail position (Fig.8)
3.
As Fig.9, release the nut & spring.
4.
Tight the nut to the right position as
shown in Fig.10, cut the plastic tape, cut
the plastic thread on sprocket, then whole
rail assembled finished.
Sectional Steel Track Assembly
2 Parts Steel Track
-6
D
-
Figure 9
Figure 10
A
:1500 mm
Sleeve
B
:1500 mm
C
:1000 mm
D
:1000 mm
E
:1000 mm
Sleeve
Sleeve
Figure 6
Figure 7
Figure 8
Содержание Force+ 1000N
Страница 31: ......