background image

 

 

 

 

User Guidelines 

– MHN-PS01 

13-06-2019 

version 001 

_____________________________________________________________ 
 

                                                

User Guide 

Transformer For Heated Gate Cutters 

 
 

 

 

 
 
 

CAUTION: 
 

Please read this instruction manual thoroughly, before start using the transformer MHN-
PS01. 
 

Содержание MHN-PS01

Страница 1: ... 06 2019 version 001 _____________________________________________________________ User Guide Transformer For Heated Gate Cutters CAUTION Please read this instruction manual thoroughly before start using the transformer MHN PS01 ...

Страница 2: ...nsation Also make sure that there is no flammable material no flammable solution and no flammable gas in the presence Do not connect any other devises than heated gate cutters HT 120 HT 130 HT 140 HT 160 HT 170 HT 180 HT 200 Always unplug the power cord after completion of operation Any faults should be reported to your supplier Do not attempt to repair the transformer as this will make the warran...

Страница 3: ...o the black 1 and red 2 connectors 3 Place the gate cutter securely on the aluminum stand 4 Turn the transformer on 4 and set the temperature 3 5 Let the gate cutter heat up it take takes approximately 20 25 minutes to reach the set temperature 6 The unit are now ready for use Front panel 1 Output for black connector 2 Output for red connector 3 Heat adjustment min max 4 Power on off switch Back p...

Страница 4: ...LARATION OF CONFORMITY Application of council directive 2014 108 EC Electromagnetic Compatibility Type of equipment Power Transformer 85 264 VAC to 24V Model name MHN PS01 Manufacture s name Mouldpro ApS Manufacturer s address Baltorpbakken 10 2750 Ballerup Denmark Date February 22 2019 Signature Stefan Hansen Managing Director ...

Страница 5: ...User Guidelines MHN PS01 13 06 2019 version 001 Change log Date of change Change Version 13 06 2019 New manual 001 ...

Отзывы: