Chapter 6 System Testing
Gen 3 Site Controller System Manual
T1 Connection Test
6-18
68P80801E30-A 5/1/2002
2.
Disconnect the Telco SmartJack from the Telco surge arrestor.
3.
Connect the T1 test set into the surge arrestor.
If the Controller is not currently connected to the Telco demarcation
point, the T1 test set can be plugged directly into the Controller.
4.
Configure the T1 test set to the settings indicated in Table 6-3.
T1 test procedure
This test involves equipment looping using the
loop [line #]
and
deloop
[line #]
MMI commands.
Table 6-3
Settings for the T1 test set
Function
Setting
Receive input
Term
Transmit output
0dB(DSX)
Timing
Int
Test
Cont
Code
B8ZS
Print Event
Off
Mode
ESF
Pattern
T1-QRSS
Results I
Summary
Results II
Time
DEMARC POINT
8 CONDUCTOR
MODULAR CABLE
T1 PHONELINE
TELCO MAINTAINED
CUSTOMER MAINTAINED
IN
OUT
NETWORK
T1
TEST SET
FACILITY
TX/RCV
TEST
CABLE
DISCONNECTED
CABLE
iSC060
052296JNM
iSC
SURGE
SUPPRESSOR
SMART JACK
Figure 6-2
T1 test connections