5-1
Chapter 5
Final
Checkout
Chapter Overview
This chapter describes the final checkout procedures to be performed after
installation of the EBTS equipment is complete. Refer to the
EBTS System
Manual (on CD: 98P80800A17)
for the final checkout of non-site control
equipment. The following table lists this chapter’s topics.
Section
Page
This section . . .
describes the procedures for proper
setup of the site control equipment
Powering the Site Controller
Rack
describes the procedures for
powering up the site control
equipment
describes the procedures for setting
the circuit breakers