Station Veri
fi
cation Procedures
Chapter 6: Con
fi
guration and Testing
Procedure 6-4
How to Configure pm_config (Continued)
4
To con
fi
gure the DPM to BR mapping, use the following command:
br <br> dpm <dpm>
5
To clear the mapping for a given BR, use the following command:
-invalidate <br>
6
To clear all mapping, use the following command:
-invalidate
7
To print all mapping, use the following command:
Station Verification Procedures
Station Veri
fi
cation Procedures cover methods to verify transmit and receive operations after a Base Radio
module has been installed or replaced. Each section contains the equipment setup and the procedure.
Base Radio Software Revision Verification
Procedure 6-5
How to Verify the Base Radio Software Version Number
1
Connect one end of the console cable to the service computer.
2
Connect the other end of the console cable to the Service Access port, located on the front
panel of the Base Radio (BR).
3
In normal application mode, login and enter command
ver -
to display Application Software
version, Boot0 version and Boot1 version.
4
Enter the test application mode:
1.
Reset the BR. When resetting the Base Radio, press the
ESC
key when prompted to
interrupt the start up sequence.
2.
Type
testapp
and press
Enter
.
3.
Log on by typing
login -ufactory
and press
Enter
. When prompted, enter
factory
for password.
5
Collect revision numbers from the BR by typing:
fv -oplatform
. Note down the test application
software version and then please refer to the System Software Release Note for correct software
version number.
If software version number does not match, perform
Software Upgrade (optional)" on page 6-23
after completion of this procedure.
6
To exit BR Test Application mode, reset the BR, by using the following command from the
MMI:
reset -oplatform
6-22
6802800U74-N September 2009
Содержание DIMETRA MTS 2
Страница 4: ...This page intentionally left blank ...
Страница 28: ...List of Procedures This page intentionally left blank xxii 6802800U74 N September 2009 ...
Страница 30: ...List of Processes This page intentionally left blank xxiv 6802800U74 N September 2009 ...
Страница 46: ...Cooling Fans Chapter 1 MTS Overview This page intentionally left blank 1 12 6802800U74 N September 2009 ...
Страница 52: ...Battery Safety Chapter 2 General Safety This page intentionally left blank 2 6 6802800U74 N September 2009 ...
Страница 146: ...Screws Chapter 4 Hardware Installation Figure 4 59 MTS 4 Screws Positions 4 70 6802800U74 N September 2009 ...
Страница 148: ...Screws Chapter 4 Hardware Installation This page intentionally left blank 4 72 6802800U74 N September 2009 ...
Страница 348: ...Base Radio Restoration Chapter 10 Base Radio This page intentionally left blank 10 12 6802800U74 N September 2009 ...
Страница 360: ...PSU TrackID Update Chapter 11 Power Supply Unit This page intentionally left blank 11 12 6802800U74 N September 2009 ...
Страница 474: ...Configuration Chapter 15 Expansion Options This page intentionally left blank 15 44 6802800U74 N September 2009 ...
Страница 476: ...Introduction Chapter 16 MTS 4 Outdoor Enclosure This page intentionally left blank 16 2 6802800U74 N September 2009 ...
Страница 486: ...This page intentionally left blank A 10 6802800U74 N September 2009 ...
Страница 492: ...This page intentionally left blank B 6 6802800U74 N September 2009 ...
Страница 496: ...This page intentionally left blank C 4 6802800U74 N September 2009 ...