2-1
2
2
Startup and Operation
Applying Power to the System
After you verify that all necessary hardware preparation is complete and
all connections are made correctly, you can apply power to the system
and/or insert the board.
Prior to applying power, first verify that the chassis power supply voltage
setting matches the voltage present in your location (if your power supply
is not autosensing). When you power-on the chassis or insert the board, the
CPIP5430 displays the BIOS banner and then runs a memory test.
Indicators
There are three LEDs and one reset switch on the front panel of the
CPIP5430.
Each indicator is described in the following sections.
LEDs for Gigabit Ethernet Port
Two LED indicators on the Ethernet connector show status of the gigabit
Ethernet port. The yellow LED indicates speed and when illuminated it
shows that the port has negotiated a 1000Mbps data rate. The green LED
indicates link activity and when illuminated, the port is linked. When the
green LED is blinking it means the port is actively transferring data.
Front Panel Indicators
Description
Ethernet
Two LEDs
Hot swap
One blue LED
Reset
One recessed push button switch