background image

3.

Wiring methods should be in accordance with the electrical standards & norms of 
the country in which the modules are being installed. 

4.

Wiring should be done only by a qualified & certified professional.

5.

 Do not cut the connectors or crimp any other thimble on module wiring (Doing so 
will void the warranty).

6.

The junction box, present on the back side of the module is designed to be used 
with standard wiring or conduit connections.

7.

The junction box has a breather port and the breather port must not be exposed to 
direct rain/water. Hence the Junction box should be mounted on the higher side of 
the module when mounted with the cable outlet pointing downward, preferably.

8.

The maximum electrical rating of an acceptable series fuse is 7.5 A (modules with 
5" cell) & 10 A (for module with 6" cell).

9.

Keep in mind to follow the applicable codes for outdoor installation of wires in 
conduits.  Verify  that  all  fittings  are  properly  installed  to  protect  wire  against 
damage & prevent moisture intrusion.

10. Number of module in series connection should not increase such that voltage 

generated is beyond system voltage.

11. Blocking Diodes ;Blocking diodes can prevent night time battery discharging and 

also prevent modules from loss of array output and damage by reverse current 
flow. Moser Baer PV modules do not contain blocking diodes when shipped from 
the factory however most battery charge regulators do have this feature.

12.  By Pass Diodes ; In systems with modules in series strings, high reverse current 

can  flow  through  cells  that  are  shaded  partially  or  when  part  of  a  module  is 
shaded and rest is exposed to the sun. These currents can cause affected cells to 
heat  up  (hot  spot  phenomenon)  and  even  damage  the  module.To  protect 
modules from high reverse currents bypass diodes are provided in the junction 
box (factory fitted). Diode rating -12A,200V

14

Содержание Max CAAP

Страница 1: ...Re energizing the World Installation and User Manual Moser Baer Photo Voltaic Modules Crystalline Silicon Modules Max Value Series...

Страница 2: ...ionals Moser Baer is a world leader in development and high volume manufacturing of technology products Our prime commitment is to produce quality products that last for many years Moser Baer PV modul...

Страница 3: ...Installation and User Manual Moser Baer Photo Voltaic Modules Crystalline Silicon Modules Max Series CAAP Value Series AHFP BAAP BCAP BDAP BGFP 1...

Страница 4: ...e Specifications 6 Product identification 7 Disclaimer of Liability 3 1 1 General safety 3 1 2 Handling safety 3 1 3 Installation safety 4 5 2 1 Site Selection 5 2 2 Tilt Angle Selection 5 2 3 Mountin...

Страница 5: ...connect while under load a provision of High Voltage Slow Blow DC Fuse or High Voltage DC MCB should be provided in the Array Junction Box 1 To avoid the hazard of electric shock and injury cover the...

Страница 6: ...he system 4 Avoid uneven shade on the PV module surface Shaded cells may become hot hot spot phenomenon which may result in permanent damage to the module 5 Do not drill holes in the frame it may comp...

Страница 7: ...winter months when the arc of the sun is lowest over the horizon 4 Solar modules produce maximum power when they are pointed directly at the sun 5 For installations where the solar modules are mounted...

Страница 8: ...allation 1 Place the modules on top of the structure mount it by using the pre drilled elliptical mounting holes as shown below fix it firmly on the structure using the mounting hardware s M4 nuts Bol...

Страница 9: ...7...

Страница 10: ...stainless steel so as to eliminate the possibility of rust 6 The Open circuit Voltage exceeds the rated voltage Take care that the open circuit voltage multiplied by the number of modules in series i...

Страница 11: ...surface to allow cooling air to circulate around the back of the module This also allows any condensation or moisture to dissipate 1 Roof mounted PV modules should be mounted on a fire resistant roof...

Страница 12: ...e surface air from circulating under the module Leave atleast 4 inches of clearance between the roof the module frame 7 Module need to be securely mounted on fire resistant roof slope less than 5 in f...

Страница 13: ...design such a system Permits are normally required to install such a system and the utility must formally inspect and approve such a system before it is connected to the grid The module frame must be...

Страница 14: ...ng is used i e grounding plus of minus such grounding means should be isolated from live parts by reinforced insulation Option 1 The grounding will be provided by fixing earthing cable with Hex Nut St...

Страница 15: ...e fluids salt and against general weathering Resistance to abrasion No Dia 56x0 30mm Dia of conductor 2 56mm Electron beam cross linked polyolefin colour Natural Electron beam cross linked polyolefin...

Страница 16: ...applicable codes for outdoor installation of wires in conduits Verify that all fittings are properly installed to protect wire against damage prevent moisture intrusion 10 Number of module in series c...

Страница 17: ...8 5 36 5 Current at Pmax Imp A 4 51 4 51 7 12 4 64 4 7 Open circuit voltage Voc V 21 78 29 04 21 5 36 05 43 26 Short Circuit Current Isc A 4 8 4 8 7 6 5 05 5 1 NOCT 2 C 47 47 47 47 47 Maximum System V...

Страница 18: ...p 3 MBPV CAAP 25 mm ice ball at 23 m s at 11 impact locations 10 156 x 156 60 10 X 6 1661 X 991 X 40 19 5 2400 50 lbs ft 5400 113 lbs ft Multi Crystalline Cells 47 2 1000 600 0 43 0 344 0 11 IP 65 40...

Страница 19: ...isible on the front side of the module 3 The code is typically MB XX X XXX XX XX XXX The date of manufacture of the product can be deciphered from the 6th 7th and 8th digit day of the year and the 9th...

Страница 20: ...Re energizing the World Doc No PV CN ENG WI 012 Rev no 01 Rev Date 25 05 2010 Manufactured by...

Отзывы: