background image

OPERATORS MANUAL FOR MORSE 185 Series Kontrol-Karriers
Serial # 0285-0693 (MMYY)

Model 185A for 55 gallon standard steel drums (22½” diameter)
Model 185B for 30 gallon standard steel drums (19” diameter)
Model 185C for steel or fibre drums (21-23” diameter)
Model 185D for steel or fibre drums (19-20½” diameter)

A.  IMPORTANT:

1.

Review the Material Safety Data Sheet(s) for the material(s) in the drum(s) and take all necessary precautions.  Safety
shoes, work gloves, hard hat and other personal protective devices are recommended.

2.

Please read all instructions 

thoroughly before attempting to operate your new MORSE drum handler.

3.

The model 185A, B, C, or D hava a maximum capacity rating of 800 Lb. FULL drum and 500 Lb. HALF-FULL drum and are
designed to lift, move and pour

 drums of size and type noted above.  DO NOT exceed these ratings.  Exceeding these

ratings or handling drums other than those mentioned above is unsafe and could result in equipment damage, excessive
wear or awkward handling.

4.

When loading, unloading, operating, or maintaining your MORSE drum handler, always use care and good judgment.
Maintain secure footing and a firm hold.  Keep hands and loose clothing away from all moving parts.  Never allow anyone
to be below any part of a raised drum handler or drum.  Read operating instructions and review the pictures in the sales
brochure before operation.

B.  OPERATING INSTRUCTIONS:

1.

With Kontrol-Karrier standing on the floor, lower hoist and engage hoist hook into the lifting eye.

2.

Raise hoist to lift Kontrol-Karrier clear of floor and move it to the drum.

3.

Position Kontrol-Karrier at a height which aligns the saddle band with the center of the drum.

4.

With the cinch chains hanging freely, push Kontrol-Karrier against the drum so that saddle will encircle the drum.

5.

Drape the cinch chain across the front of the drum and insert one link into the slot on the ratchet handle . Turn the ratchet
handle clockwise to tighten the cinch chain around the drum (see detail).

6.

Raise hoist and position the drum at the pouring station.

7.

Pour the drum by pulling on the pull chain and rotating the drum to a suitable pouring angle. For best control of drum
pouring angle, pay out one side of the loop while pulling in the other side, thus being able to hold back the drum rotation
after the load shifts.

8.

After pouring is completed, rotate the drum back to vertical position and lower hoist to return drum to floor.

9.

To remove drum: Pull ratchet handle to relieve pressure on ratchet teeth. Lift pawl handle to release teeth engagement and
rotate ratchet to loosen chain and allow its removal from notch.

CAUTION:
DO NOT allow drum to impact on floor, ground, or dumping station, etc.

CAUTION:
DO NOT exceed weight capacity of  800 Lb. for FULL drum,  500 Lb. for HALF-FULL drum.

C. MAINTENANCE:

1.

Lubricate gear teeth and roller chain.

2.

Clean and oil ratchet, pawl, saddle hinge, and other moving parts periodically. (Clean & lubricate more often in environments
where dust, dirt or other foreign particles will effect the performance of moving parts.)

3.

Periodically inspect all moving parts, framework, and contact areas for signs of wear, fatigue, or loosening. Tighten adjust or
replace parts as necessary to prevent failure and maintain proper function.

COPYRIGHT 2002 MORSE MFG. CO., INC.

Form PL 185 (0285-0693)

(Updated 6/2002)

        Page 1

MORSE MFG. CO., INC.

 

        

•         727 West Manlius Street         •         P.O. Box 518         •         East Syracuse,  NY 13057-0518

Phone: 315-437-8475     •     Fax: 315-437-1029     •     Email: service@

MORSE

mfg

co

.com     •     Website: www.

MORSE

mfg

co

.com

185 SERIES

KONTROL-KARRIERS

The Specialist In Drum Handling Equipment

Отзывы: