Maintenance
6-6
August 2014
C2 Contour Air Drill
Opener Maintenance - Continued
Opener Body Assembly
Torque to 50 lbs-ft.
(68 Nm) Lo
w
er link should still rotate freely
.
Re-tor
que after initial 50 hour
s and periodicall
y thereafter
.
Torque until there is no visib
le gap betw
een upper
link cle
vis and seed fr
ame
. Upper link will pre
vent
opener mo
vement if o
ver tightened.
Torque to
50 lbs-ft.
(68 Nm)
Torque until there is no visib
le
gap betw
een lo
w
er link cle
vis
Содержание C2 Contour
Страница 1: ...OPERATOR S MANUAL S50150 02 C2 Contour Air Drill...
Страница 2: ......
Страница 14: ...Safety 1 10 August 2014 C2 Contour Air Drill Safety Signs Continued Decal Locations 25 and 31 Models...
Страница 15: ...Safety C2 Contour Air Drill August 2014 1 11 Safety Signs Continued Decal Locations 41 and 51 Models...
Страница 16: ...Safety 1 12 August 2014 C2 Contour Air Drill Safety Signs Continued Decal Locations 61 and 71 Models...
Страница 17: ...Safety C2 Contour Air Drill August 2014 1 13 Safety Signs Continued Decal Locations 80 86 and 90 Models...
Страница 19: ...Safety C2 Contour Air Drill August 2014 1 15 Lighting and Marking Continued...
Страница 20: ...Safety 1 16 August 2014 C2 Contour Air Drill Lighting and Marking Continued...
Страница 28: ...Checklist 3 4 August 2014 C2 Contour Air Drill Notes...
Страница 56: ...Operation 5 26 August 2014 C2 Contour Air Drill Notes...
Страница 82: ...Maintenance 6 26 August 2014 C2 Contour Air Drill Notes...
Страница 86: ...Storage 7 4 August 2014 C2 Contour Air Drill Notes...
Страница 91: ......