3-13
7. SERVICE PROCEDURE
7.1 OUTLINE OF INSPECTION AND MAINTENANCE PROCEDURES
This section explains the methods for inspection and maintenance operations listed in “6. MAINTENANCE SCHEDULE
CHART”.
Always observe the precautions related to safety for each item, and carry out the operation safely.
If the operation is difficult, do not try to carry it out; please contact your distributor.
• The operations in this section require the following parts to be removed or opened, and then installed or closed.
For details of the procedure, see the following sections.
(1) Engine inspection cover
: See “OPERATION, 2.14 ENGINE INSPECTION COVER”.
(2) Battery inspection cover
: See “OPERATION, 2.15 BATTERY INSPECTION COVER”.
(3) Front grill:
See “OPERATION, 2.16 FRONT GRILL”.
(4) Und
ercover: See “OPERATION, 2.17 UNDERCOVER”.
7.2 INITIAL 100 HOURS SERVICE
Carry out the following maintenance after the initial 100 hours breaking-in operation for new machines.
[1] CHANGE ENGINE LUBRICATING OIL, REPLACE ENGINE OIL FILTER
For details of the method of maintenance, see EVERY 500 HOURS SERVICE.
[2] REPLACE HYDRAULIC LINE FILTER
For details of the method of maintenance, see EVERY 500 HOURS SERVICE.
[3] CHANGE OIL IN HYDRAULIC TANK
For details of the method of maintenance, see EVERY 500 HOURS SERVICE.
7.3 INITIAL 500 HOURS SERVICE
Carry out the following maintenance after the initial 500 hours breaking-in operation for new machines.
[1] CHANGE OIL INSIDE TRAVEL MOTOR REDUCTION GEAR CASE
For details of the method of maintenance, see EVERY 1500 HOURS SERVICE.
Содержание MST-800VD
Страница 2: ......
Страница 6: ...A 4 ...
Страница 12: ...0 6 ...
Страница 34: ...1 22 ...
Страница 131: ...4 1 SPECIFICATIONS 1 DIMENSIONDRAWING 4 2 2 SPECIFICATIONSTABLE 4 3 ...
Страница 132: ...4 2 1 DIMENSION DRAWING CabSpecifications CanopySpecifications ...