SunSaver
Field Testing Procedures
Abstract:
The following test procedure was developed for use in fi eld conditions, where no external power sources are available.
T
echnical Documentation
e
c
h
n
i
a
l
D
o
u
m
t
Страница 1: ...rocedures Abstract The following test procedure was developed for use in field conditions where no external power sources are available T e c h n i c a l D o c u m e n t a t i o n T e c h n i c a l D...
Страница 2: ...V 2A load type 1156 automotive lamp with socket works well Short length 6 in of 12AWG solid wire Caution The following outlined procedures assume a basic working knowledge of electrical circuits Ex er...
Страница 3: ...ltage at the battery terminals B Measure the voltage at the load terminals The voltage should be the same 200mV as the battery voltage If load voltage is significantly lower than battery voltage LVD F...
Страница 4: ...voltage If the Load voltage is more than 0 25V lower than the Battery voltage the LVD FET s are damaged Battery Load Battery 2A Load PV Array Step 5 SunSaver Installed in the Power System A Check the...
Страница 5: ...page 5 of 5 SS APP Field_Test 01 EN 2011 Morningstar Corporation All rights reserved page 5 of 5 Revision Date 09 29 11...