TOOLS REQUIRED:

 

www.morningstarcorp.com

GenStar MPPT

4

 

MOUNTING:

Use mounting template to mark, and drill (3)-1/8 in. screw 
hole locations. Drive top screw head to 1/4 in. from flush 
with wall. Hang keyhole slot on hanging screw head - see       
lower-right illustration. Drive top screw head and (2) lower 
screw heads flush with mounting brackets.

3

2

1

           

           WARNING:

  

Shock Hazard

                

              

Verify that the solar, load and battery breakers  

            and/or disconnects remain open (disconnected)  

 until after all of the system wiring has been completed.

 INSTALLATION SAFETY:

   

Quick Start Guide

Use following URL to register Morningstar GenStar MPPT:

 https://www.morningstarcorp.com/product-registration

AT LEAST

6” (150 mm)

AT LEAST

6” (150 mm)

AT LEAST

3” (75 mm)

AT LEAST

1” (25 mm)

WARM AIR

COOL  AIR

GenStar Installation Clearances

[

Choose an indoor mounting location, with no exposure to 
sun or water. When mounting, allow for proper air flow, as 
seen in upper-right illustration. 

SPECIFICATIONS:

GS-MPPT-60

GS-MPPT-80 GS-MPPT-100

Nominal Battery 

Voltage

12-24-48V

12-24-48V

12-24-48V

Maximum PV Open-

circuit Voltage

200V

200V

200V

Nominal Maximum 

Output Power

800-1600-

3200W

1075-2150-

4300W

1350-2700-

5400W

Maximum 

Recommended PV 

Input

1

1200-2400-

4800W

1600-3200-

6400W

2000-4000-

8000W

Max. Battery Charging 

Current

60A

80A

100A

Rated Load Current

30A

30A

30A

1  

150% of 

Nominal Maximum Output Power

+

-

12V-24-48V

 BATTERY

BATT 

(+)

GND

COMMON

NEGATIVES

PV INPUT

PV

(+)

LOAD 

(+)

LOAD 

(-)

PV 

Breaker

Battery 

Breaker

Install ferrite core around 

PV (+) and (-) wires, 

then close and lock core

IMPORTANT:   DO NOT CONNECT THE 

SOLAR INPUT UNTIL AFTER THE 

CONTROLLER HAS BEEN COMMISSIONED

LOAD

    (-)

Earth 

Ground

Equipment

Grounding

Conductor           

Grounding

Electrode

Conductor           

+

--

+

+

--

--

--

--

--

--

 

Install ferrite 

core with at 

least one 

Ethernet wire 

loop, then 

close and 

lock core.

WIRING SCHEMATIC –

see accessory wiring details on p. 5 - 

reverse

WIRE SIZE RANGES and TORQUE REQUIREMENTS

Connection Point

Wire Size

Max. Torque

Power Terminals

        

#8-1/0 AWG 

      (8.4 - 53.4 mm

2

)

 

100 in-lb 

(11.3 N-m)       

           Load Terminals

#14-6  AWG              

(2.1 - 13.3 mm

2

)

35 in-lb

(4.0 N-m)

Equipment Grounding         

Terminal

#14-#2 AWG 

(2.1 - 33.6 mm

2

)

50 in-lb

 (5.6 N-m)         

Battery Voltage Sense 

Terminals

#24-16 AWG  

 (0.2 - 1.3 mm

2

5 in-lb (0.56 N-m)

Remote Temperature Sensor

INCLUDED

5 in-lb (0.56 N-m)

 Solar Charging System Controller

Contact Information:

www.morningstarcorp.com

Phone: 1-215-321-4457

                      

LEGEND

    

                 

POSITIVE CONDUCTOR

              NEGATIVE

 CONDUCTOR

INCLUDES:

  Charge controller; Remote              

Temperature Sensor (RTS); SD card inside SD card 

holder; (1) one-meter MS-CAN Cable; (3) ferrite 

cores; mounting template; (4)-#10  mounting screws

 IMPORTANT SAFETY INFORMATION:

         

WARNING: 

Shock Hazard

           The Morningstar GenStar MPPT must be installed 

by a qualified technician in accordance with the electrical 

regulations of the installation location.

           WARNING: 

Shock Hazard

           This unit is not provided with a GFDI device. This 

charge controller must be used with an external GFDI 

device as required by Article 690 of the U.S. National 

Electrical Code and depending on the installation location.

 

  

CAUTION: 

This guide must be used with    

 

 

the full product manual that includes 

 

 

important information. Read the GenStar     

 product manual for all specifications, safety, regulatory and  
 warranty information, and for all required instructions, 
 installation procedures, configuration, and operation 
 details.

  

                

     

    

          

                                      

                                

           

 OPTIONAL ACCESSORIES:

  

See product manuals at www.morningstarcorp.com/   

  support/library/ 

   

  ReadyRelay (RB-Relay-1)

  The ReadyRelay is an expansion block that adds AC or 

  DC relay dry contact hardware functionality and firmware  

  control and logic to the Morningstar GenStar MPPT 

  charge controller.  

  ReadyShunt (RB-Shunt-1)

  The ReadyShunt is an expansion block designed to   

  display measured branch currents, count Amp-hours for 

  those branches, and allow net maximum charge current 

  into a battery, but not exceeding the battery’s maximum 

  charging rate. 

  ReadyBMS (RB-BMS-1)

  The ReadyBMS provides simple visibility of battery  

  performance, hands-free settings and optimized battery   

  control. Through the ReadyBMS, the GenStar MPPT will  

  report any data variable contained in the battery BMS. 

FULL MANUAL INSTRUCTIONS:

Pencil

          WARNING:

  

Equipment Damage or Risk of    

           Explosion

Never install the GenStar MPPT in an enclosure 

with vented/flooded batteries. Battery fumes 

are flammable and will corrode and destroy the 

GenStar MPPT circuits.

           

WARNING:

  

Risk Of Electrical Shock.

 

 

  

NO  POWER OR ACCESSORY 

TERMINALS ARE ELECTRICALLY ISOLATED 

FROM DC INPUT, AND MAY BE ENERGIZED 

WITH HAZARDOUS SOLAR VOLTAGE. UNDER 

CERTAIN FAULT CONDITIONS, BATTERY COULD 

BECOME OVER-CHARGED. TEST BETWEEN 

ALL TERMINALS AND GROUND BEFORE 

TOUCHING. 

            CAUTION:

  

Equipment Damage

  

Ensure sufficient ventilation - see     

  

clearance illustration on p. 3 - and do not 

install in a sealed  enclosure. Improper

ventilation will result in over-heating and a 

decreased product lifetime.

!

CAUTION:  Equipment Damage

Power UP Sequence 

- refer to manual’s 

LED Indications Section for full details

:

     1. Connect Battery/Battery Bank.

     2. Connect Solar.

  Power DOWN Sequence:

       1. Disconnect Solar. 

       2. Disconnect Battery/Battery Bank.

!

!

Gen

S

tar

MPPT™

NOTE:  Actual wire routing and 
connection hardware components 
may vary.