DMD System Operation
Switch ON & Start-Up Sequence
When all connections have successfully been made to both the surface & subsea equipment as per
the manual sections ‘System Connections – SUBSEA’ & ‘System Connections – SURFACE’ the
equipment can then be powered ON.
Powering should be initiated in the following sequence:
•
Power On the ‘TOUGHBOOK’ Laptop
(Laptop can be powered via its own internal Lithium battery or connected to a mains
supply using its dedicated charging adapter PSU)
•
Once the laptop has ‘booted’ to the desktop double click the Genesis (DMD) shortcut to launch
the system software
•
The Genesis version splash screen will appear briefly followed by a plain Grey screen as
seen below
IMPORTANT
– If the DMD SCU Air
transportation fuses were previously
removed for shipping purposes then
these must be re-fitted. If not fitted
the SCU will be unable to supply
power via the Diver Cable to the
SSC