XG0223
8
Installation
45”
40”
45”
23 3/4”
40”
NOTE: When constructing the
framed opening, please ensure
there is access to install the gas
line when the unit is installed.
1). Slide the fireplace into the cavity.
2). Tack four studs in place, shown in Figure 2 and 3 as dashed lines.
3). Secure the fireplace in position by nailing into these cleats.
Section 2: Framing
Figure 3.b
Framing dimensions (Straight wall & Corner Installation).
Figure 3.b.b
Securing the fireplace to the framing cleats, both walls typical.
B
Combustible
shelf
NG or
Propane
REAR VENT
NG AND
PROPANE OK
C*
A
A
Back Framing the unit
Top vent - Shelf over fireplace framing
Top vent - Shelf over fireplace framing
10"
L38ST Only
Figure 3.b
Combustible Framing for shelves over the fireplace, Top vent.
SUPPLIED SHIELD
COMBUSTIBLE SHELF
A
B
C
PEL
SHORT 90°
ELBOW
Figure 3.c
Combustible Framing for shelves over the fireplace, Side vent.
NON-COMBUSTIBLE HEADER
COMBUSTIBLE HEADER
L38ST
A
41''
B
40''
C
23
¾
''
L52ST
A
59''
B
39''
C
23
¾
''
L42ST
A
45''
B
40''
C
23
¾
''
L38ST
A
41” Min N.G.
54” Min Propane
B
2'' Min.
C
17½” Min N.G.
17½” Min Propane
L42ST
A
41” Min N.G.
54” Min Propane
B
2'' Min.
C
17½” Min N.G.
17½” Min Propane
L52ST
A
84” Min.
B
2'' Min.
C
30” Min.
Содержание L38FSD
Страница 45: ...XG0223 45 Notes ...