XG0223
10
Installation
40”
Installing The Heat Guard - L42ST
Installing The Heat Guard - L38ST
Figure 4.
Combustible Framing Side Heat Shield L42FS01 x 4 pcs.
Figure 4.
Installing the supplied metal headers, both sides typical.
Figure 4.
Non combustible header H42ST060 x 2 pcs.
Included with the L42DF-ST Gas fireplace, is a framing heat shield Kit.
This kit is fabricated from galvanized steel and arrives with six (6) pieces,
as shown below. The shields protect all adjacent combustible materials,
mantels and mouldings from excessive heat radiated by the fireplace.
STEP 1.
Fasten 4 side shields in place with nails or screws, flush with
the framing as shown. These are installed with the Wide flanges facing
the center of the fireplace opening, and the shallow flange toward
inside of room.
Included with the L38DF-ST* gas fireplace are two metal headers
made of galvanized steel. The metal headers must be installed after
the fireplace has been back framed in place. Install metal headers at
34 1/2" from the base of the unit, as shown in figure 6.
STEP 2.
Nail or screw the top shield in place flush with framing
NOTE:
The nailing flange extension can be substituted with a piece of
NON-Combustible material of the same size and thermal characteristics,
ie: cement board or equivalent. This is recommended in applications
where the facing materials will not adhere to the metal nailing flange.
Installing the Nailing Flange Extension
Figure 4.c
Securing the Nailing Flange Extension.
Before installing the supplied nailing flange extension, fold tabs at
bottom of nailing flange to a 90° angle.
NOTE:
Do not install nailing
flange when installing a Montigo Surround.
NOT NEEDED FOR L52ST
Framing
Flush with
framing
Fasteners
Fireplace
INSET
SECTION
Both sides
shields typical
Both walls may not be
exactly as shown
Both walls may not be
exactly as shown
40”
40"
40"
35"
45"
35½"
45"
23¾"
23¾"
40”
34½"
Supplied Non-Combustible Header
6" Nailing Flange
Содержание L38FSD
Страница 45: ...XG0223 45 Notes ...