background image

2. 

Unpacking the Rooflight Components

Carefully lay the box 

containing the rooflight 

onto the floor and 

open. For a slate roof 

installation, remove the 

foam wedge located on 

the front of the flashing 

plate. 

With the rooflight face 

down to the floor, unfold 

the lead flashing along 

the lower edge so that it 

is flat. Located on each 

of the two long sides 

of the rooflight are two 

metal brackets. Fold each 

of these up so that they 

are at a 90° angle to the 

flashing plate.

Installation Instructions

1. 

Roof Level Trimming Requirements

Establish the position in which the SUNPIPE is to be 

installed and remove the tiles or slates from around 

the area. 

Form a clear  trimmed 

opening of 570 mm 

high by 470 mm wide. 

Note that the top edge 

of the lower trimming 

batten should be 

located 90 mm from 

the lower roof tiles.

3.

  Locating the Rooflight on the Roof

Lift the rooflight to the 

desired location on 

the roof. 

This should be 

positioned to allow the 

four metal brackets to 

the inside face of the 

side trusses.

The lower lead 

flashing is to overlap 

the roof tiles located 

just below the roof 

light opening.

4. 

Fixing the Rooflight

Using suitable screws 

(supplied by others) secure 

each of the four metal 

brackets to the side trusses.

Once secure, use your hand 

or a rubber mallet to mold 

the lead flashing plate to 

match the profile of the roof 

tiles.

For a slate roof, gently flatten 

the lower lead flashing to the 

top of the roof slates using 

your hand.

[email protected] / +44 (0)1494 897700

1

Отзывы: