MolokDomino® Plus installation instruction
1.
Dig a 500 mm installation pit for MolokDomino® Plus. Width of the pit should be 2400 mm. Carefully level the
bottom with 0/16mm crushed gravel, check the straightness with spirit lever/ line laser and compact the ground
carefully.
2.
Fix the plastic bottom anchors into the container
with two bolts each (bolts are tightened max. 25 Nm).
3.
Lift the container to the installation pit by using lifting
loops. Note to remove the lifting loops after the installation.
When installing the containers into a group, leave 40 mm distance
between the tops of the wells and attach the adjacent containers
with an upper rail (u-profile). The rail is drilled through the support
frame
and fastened from 8 points with pop rivets, see image 1.
4.
Fill the pit as described in the image 2 - note to change the
soil types accordingly. Fill evenly on both sides of the containers
to keep the container straight. With a light plate compactor,
compact the filling soil carefully with every 200 mm layer.
We recommend to use max. 100 kg round compactor.
Expanded clay ( e.g. Leca®) is used between the containers near
ground level.
Make sure that the finishing layer slopes slightly downward
from the container.
5.
In group installations, finish the framings by fastening
extension pieces for framing (A+B) with pop rivets, see image
3. First fasten the lower horizontal support profile (B)
in line with the framing element. Place the vertical
extension piece (A) on correct place between the
two framing elements and fasten the upper horizontal
support profile (B). Finish the framing by fastening
the vertical extension piece (A) to the horizontal support
profiles (B). Make sure the vertical extension piece is installed
straight.
6.
Lift and open the lifting bag carefully and check that the
bottom of the lifting bag is closed tightly and the rope is
placed according to the instructions. It is possible for the
lifting bag’s closing mechanism to open during delivery.
7.
Place the lids, lifting bags and quick systems on their place.
If the lid is not fastened to the quick system; fasten the lid with
M8 x 35 torx screws. There are 3 screws per lid. Cover plate is
used on the hole of the lifting handle: fasten the cover plate
with screws.
A
B
C
Image 2.
Filling the pit
A
- Finishing layer, 100 mm
B
- Gravel 0/32, 400 mm
C
- Crushed gravel 0/16, min. 50 mm
B
A
B
Image 3. Finishing the framing
Image 1.
Fastening the upper rail