
Installation and Setup of StakMax® system
24
0112-0133 Rev B
Figure 2-8
Connecting the power supply to the cable.
3.
Connect the power cable to the wall outlet, surge suppressor or
UPS, and then wait three seconds.
4.
Press the Power/Reset button (located on the front-left side of the
instrument) to initialize the instrument. After a few seconds, the
Power/Reset button turns green.
Note:
Connecting through a surge suppressor or UPS is preferred.
Содержание StakMax
Страница 1: ...StakMax Plate Handling System User Guide 0112 0133 Rev B May 2010...
Страница 6: ...Contents 6 0112 0133 Rev B General Specifications 141 Diagrams 142...
Страница 10: ...Safety 10 0112 0133 Rev B...
Страница 14: ...Introduction 14 0112 0133 Rev B...
Страница 59: ...StakMax Plate Handling System User Guide 0112 0133 Rev B 59 Figure 3 9 Pressing the Power Reset button...
Страница 80: ...Installation and Setup of SpectraMax L instrument 80 0112 0133 Rev B...
Страница 116: ...Operation 116 0112 0133 Rev B...
Страница 146: ...System Diagrams and Specifications 146 0112 0133 Rev B...