SkanWasher 400 User Guide
5
Chapter 2: Installation
Step 1
Verify voltage is properly set for incoming line voltage.
Check the current voltage setting in the red window of the voltage
setting switch.
Step 2
Change voltage setting, if indicated.
Remove the switch using a small screwdriver inserted into red
window.
Turn the switch until the proper setting faces outward.
Reinstall switch.
Step 3
Connect the power cord.
Insert the power cord into the receptacle located on the back of
the instrument.
Plug the power cord into the main power outlet.
Step 4
Connect Waste Reservoir (refer to Figure 1).
Connect the outlet tubing line (red) from the waste reservoir to
the Outlet port on the back of the instrument.
Connect the waste alarm cable from the waste reservoir to the
Waste Alarm port on the back on the instrument.
TIP:
Save the packing material.
You may need it for later transport
of the unit.
!! IMPORTANT:
Voltage setting
switch is located below the main
power receptacle on the back of the
instrument.
CAUTION:
Before connecting
the main power, ensure that the
voltage switch on the back of
the instrument is set correctly
for the incoming line voltage
(Step 1).