5.3 Re-torque at Process Temperature
CAUTION
If nozzles and gate seals are not re-torqued at process temperature
leakage could occur.
CAUTION
Once the system is assembled, nozzles and gate seals must be re-torqued at
process temperature.
1. Set the temperature of all Hot Runner components to processing
temperature according to the start up procedure.
2. Make sure all cooling lines other than the cover plate are connected
properly.
3. After reaching the processing temperature let the system ‘soak’ at that
temperature for at least five minutes.
4. Re-torque nozzles and gate seals to recommended torque values in “11.1
Recommended Torque Settings” on page 11-1.
5.4 Check Nozzle Core to Manifold Fit
5. Inspect threads for burrs.
6. Apply die spotting blue compound to nozzle core.
5-5
© 2020 Mold-Masters (2007) Limited. All Rights Reserved.
ASSEMBLY
FSG2 User Manual
Содержание Fusion G2
Страница 1: ...version 14 User Manual Original Instructions...
Страница 2: ......
Страница 10: ......
Страница 64: ......
Страница 151: ......