Section 5 - Preparation
WARNING
Ensure you have fully read “Section 3 - Safety” before unpacking, cleaning
or assembling the E-Multi injection unit.
When doing any work that requires lifting the machine, connect all lifting
devices and support the machine using a crane of adequate capacity
before commencing work. Failure to support the machine can result in
severe injury or death. See “E-Multi Weight Specifications” on page 3-20
for weight, dimensions and safe lifting instructions.
5.1 Shipping Contents
E-Multi Crate:
• E-Multi injection unit
•
Oil fill kit (optional)
• Lifting hardware
• Horizontal and vertical feed blocks, feed tube and feed adapter and
hardware
• Hook spanner
• Adapter plate and hardware (optional)
Controller Crate:
• E-Multi controller
• Heat, I/O and E67 cables
• SPI adapters (optional)
• Diagnostic kit (optional)
• KeTop remote pendant (optional)
• Documentation package
Stand Crate:
• E-Multi stand and hardware
Figure 5-1
Oil fill kit (optional)
5-1
PREPARATION
E-Multi User Manual
© 2020 Mold-Masters (2007) Limited. All Rights Reserved.