background image

Important:

The Master Controller is mounted on the front of the MT10 / MT12 or CT20 / CT22 tank chassis.

Never stack a CT20 /CT22 Tank on top of any Pump.  Never stack a Pump on top of any Tank.

Recommend pumps only be stacked a maximum of two high.

All units shipped with all leveling feet set to lowest position.

11 in. 

(28 cm)

Master Controller Assembly Dimensions

10 in. 

(24 cm)

11 in. (28 cm)

13.5 in. (34 cm)

3 in. 

(8 cm)

V3, V5 and V7 Vacuum Pump Dimensions

17 in. 

(43 cm)

25 in.

(64 cm)

21 in.

(53 cm)

17.5 in.
(44 cm)

2V3 or 2V5 System Installation 

Recommended Stacked Pumps with Tank on Side

33 in. 

(84 cm)

34 in. 

(86 cm)

V3, V5 and V7 System Dimensions

23 in.

(58 cm)

50 in. 

(127 cm)

2V7, 2V3CT or 2V5CT System Installation 

Recommended Stacked Pumps with CT20 / CT22 Tank on Side

34 in. 

(86 cm)

50 in. 

(127 cm)

MT10 / MT12 10 Gallon Tank Dimensions

22 in. 

(56 cm)

29 in. 

(74 cm)

33 in. 

(84 cm)

ASSEMBLY DIMENSIONS

CT20 / CT22 Continuum Tank Dimensions

42 in. 

(107 cm)

25 in. (64 cm)

23 in. 

(58 cm)

23 in. 

(58 cm)

Содержание V3

Страница 1: ..._____________________ Phone __________________________________________________ Dealer __________________________________________________ Dealer Address __________________________________________________ All installations must conform to local codes All pumps comply with NFPA 99C level 3 requirements System being installed AS CHECKED q V3 q V5 q V7 q 2V3 q 2V3CT q 2V5 q 2V5CT q 2V7 q 3V5 q 4V5 ...

Страница 2: ...aust to Outside Vent V3 V5 or V7 Vacuum Pump Heat Exchanger Gate Valve Check Valve Sewer Drain MT10 Separator Tank Gas Typical MOJAVE System Installation Liquids Solids System Components V3 V5 V7 2V3 2V3CT 2V5 2V5CT 2V7 3V5 4V5 V3 Pump Assembly 1 0 0 2 2 0 0 0 0 0 V5 Pump Assembly 0 1 0 0 0 2 2 0 3 4 V7 Pump Assembly 0 0 1 0 0 0 0 2 0 0 MT10 MT12 Tank Assembly 1 1 1 1 0 1 0 0 0 0 CT20 CT22 Tank As...

Страница 3: ... in 28 cm 13 5 in 34 cm 3 in 8 cm V3 V5 and V7 Vacuum Pump Dimensions 17 in 43 cm 25 in 64 cm 21 in 53 cm 17 5 in 44 cm 2V3 or 2V5 System Installation Recommended Stacked Pumps with Tank on Side 33 in 84 cm 34 in 86 cm V3 V5 and V7 System Dimensions 23 in 58 cm 50 in 127 cm 2V7 2V3CT or 2V5CT System Installation Recommended Stacked Pumps with CT20 CT22 Tank on Side 34 in 86 cm 50 in 127 cm MT10 MT...

Страница 4: ... Height from Riser Trap to Main Line OVERHEAD INSTALLATION Alternate system installation layout should be used only when unable to use the sub floor plumbing layout Ceiling Junction Box See Note 2 1 2 Inch Diameter Riser Minimum Slope 1 4 inch per 10 Feet Main Line Riser for connection to tank input See Note 1 MAIN LINE See Notes 2 3 4 Junction Box See Note 2 MAIN LINE See Notes 2 3 4 5 CONNECTOR ...

Страница 5: ...ng water pressure between 20 and 100 psi for daily tank washout Valve location must be no more than 10 feet from the tank installation to allow connection of supplied 10 foot 3 8 inch Poly tubing to the tank washout port Provisions for backflow prevention may be required Check local code requirements E MASTER CONTROLLER ELECTRIC OUTLET Master Controller requires a dedicated standalone 120V 5 AMP o...

Страница 6: ... PVC Sch 40 2 PVC Sch 40 One 3 or two 2 PVC Sch 40 One 3 or two 2 PVC Sch 40 One 3 or two 2 PVC Sch 40 One 4 or three 2 PVC Sch 40 Two 3 or four 2 PVC Sch 40 Exhaust Vent Pipe Not Using Heat Exchanger See note 1 2 Metal Pipe 2 Metal Pipe 2 Metal Pipe One 3 or two 2 Metal Pipe One 3 or two 2 Metal Pipe One 3 or two 2 Metal Pipe One 4 or three 2 Metal Pipe Two 3 or four 2 Metal Pipe Minimum Suction ...

Страница 7: ...rizontal to Floor 3 PVC or Copper Clean out Plug Used with P N MIK4 Supplied by Plumber Air F l o w 2 PVC or Copper Tubing for Tank Hose Supplied by Plumber Check Valve Side View CT20 TANK INLET CONNECTION DETAIL 6 inch Riser Customer Supplied Tee Connector 3 4 FNPT 2 Flexible Coupling Connector 1 4 inch Vacuum Sample Port to Master Controller Reducing Bushing Swivel Elbow 2 Pipe for connection to...

Страница 8: ...ush Elbow 35 18 Exhaust Vent Protection If the exhaust piping is venting to the outside of the building precautions must be taken to protect the equipment room from weather elements and animal intrusion This can be accomplished by using one of the three methods shown on the right Wall Mounted Outside Vent Protection Shroud Screen Roof Mounted Outside Vent Protection Shroud Screen Screen Exhaust Ve...

Отзывы: