![Moeller LE 4-505-BS1 Скачать руководство пользователя страница 73](http://html1.mh-extra.com/html/moeller/le-4-505-bs1/le-4-505-bs1_hardware-and-engineering_1819277073.webp)
Construction and wiring of
the modules AM 1
and AM 2
71
02/98 AWB 27-1314-GB
Figure 18: Sealing the cable entry in a coupling module
햲
Cable entry
햳
Contact knife
햴
Cable tray
햵
Blanking grommet
햶
Cable entry grommet
왘
Place the ASi cable in the cable tray. It is held in
the correct position using spring clips.
왘
Attach the plain cover or user module to the
coupling module with screws provided.
When the screws are tightened, the two halves of the
cable trays are pressed together to clamp the cable.
At the same time, the contact knives penetrate the
cable insulation and the cable core insulation,
making contact with the conductors within.
2.
2.
1.
1.
햲
햳
햴
햵
햶
H1314G.BK Seite 71 Freitag, 2. Juli 1999 9:02 09
Содержание LE 4-505-BS1
Страница 6: ...4 02 98 AWB 27 1314 GB H1314G BK Seite 4 Freitag 2 Juli 1999 9 02 09...
Страница 12: ...10 02 98 AWB 27 1314 GB H1314G BK Seite 10 Freitag 2 Juli 1999 9 02 09...
Страница 20: ...18 02 98 AWB 27 1314 GB H1314G BK Seite 18 Freitag 2 Juli 1999 9 02 09...
Страница 24: ...22 02 98 AWB 27 1314 GB H1314G BK Seite 22 Freitag 2 Juli 1999 9 02 09...
Страница 32: ...30 02 98 AWB 27 1314 GB H1314G BK Seite 30 Freitag 2 Juli 1999 9 02 09...
Страница 34: ...32 02 98 AWB 27 1314 GB H1314G BK Seite 32 Freitag 2 Juli 1999 9 02 09...
Страница 52: ...50 02 98 AWB 27 1314 GB H1314G BK Seite 50 Freitag 2 Juli 1999 9 02 09...
Страница 58: ...56 02 98 AWB 27 1314 GB H1314G BK Seite 56 Freitag 2 Juli 1999 9 02 09...
Страница 68: ...66 02 98 AWB 27 1314 GB H1314G BK Seite 66 Freitag 2 Juli 1999 9 02 09...