![Moeller AWB2700-1426GB Скачать руководство пользователя страница 48](http://html1.mh-extra.com/html/moeller/awb2700-1426gb/awb2700-1426gb_manual_1819288048.webp)
Mounting / Dismounting
44
11/01 AWB2700-1426GB
Mechanical Mounting
General Mounting Regulations
Notes on mounting / dismounting of XI/ON modules can be
found in the manual "XI/ON PROFIBUS-DP",
AWB2700-1394GB.
The following regulations are valid in addition to the moun-
ting notes given in the manual:
• The XStart modules are mounted on to two parallel top-
hat mounting rails.
• These two top hat rails have a concentric distance of 125
mm / 4.92 inch.
• It is not necessary to supply XStart with 24 V DC auxiliary
voltage via a separate power distribution module. If
however a potential isolation to the remaining XI/ON
modules is required, a power distribution module can be
mounted before the first XStart module from the left.
• If further XI/ON modules follow XStart on the XI/ON
station, then a new power distribution module must be
mounted to the right of each last XStart module. The
reason for this is to be found in the separation of the C-
rail: This being interrupted by the XStart modules.
Figure 28: XI/ON system extension with two groups of XStart and
potential isolation
For Immediate Delivery call KMParts.com at (866) 595-9616
Содержание AWB2700-1426GB
Страница 8: ...11 01 AWB2700 1426GB 4 For Immediate Delivery call KMParts com at 866 595 9616...
Страница 12: ...8 11 01 AWB2700 1426GB For Immediate Delivery call KMParts com at 866 595 9616...
Страница 46: ...42 11 01 AWB2700 1426GB For Immediate Delivery call KMParts com at 866 595 9616...
Страница 67: ...For Immediate Delivery call KMParts com at 866 595 9616...
Страница 96: ...11 01 AWB2700 1426GB 92 For Immediate Delivery call KMParts com at 866 595 9616...