Installation Checklist
Go through the following checklist to ensure you have installed the appliance correctly
□
Correctly sized cavity to suit your fascia and flue configuration
□
Correct clearances to combustibles
□
An electrical isolating switch to the appliance, accessible after finished installation
□
Correctly sized gas supply with a pressure test point, ensuring adequate supply with all
other gas appliances in the dwelling running
□
Gas type conversion process carried out if required
□
A weather-tight installed horizontal or vertical powerflue terminal with clearance as
specified by AS/NZ5601.1
□
If chosen, reasonable access to the outside face of the horizontal powerflue wall
terminal for maintenance purposes and flue attached to the rear of the
horizontal powerflue wall terminal leading back to the appliance (or
similar for vertical powerflue terminals)
□
The electrical cable from the powerflue terminal attached correctly and run back to the
appliance cavity in an electrically safe manner
□
The appliance fixed to the cavity base
□
The appliance plugged into a mains electricity supply
□
All gas joints and pressure points leak tested with suitable leak detection solution and
drop tests completed on gas pipework
□
Fuel bed correctly installed
□
Glass correctly fitted
□
A fitted fascia
□
Operated the fire and verified that it lights reliably and safely
□
Appliance functions checked, including thermostat operation, Effect Only, and Fan
Boost
□
Data label marked up with correct gas type and dated by installer if converted during
installation
□
Home-owner shown how to operate the appliance correctly
□
Warranty card filled in with installer details and appliance serial number
□
User Guide made available for end user
□
Plumbing Industry Commission Compliance Certificate given to end user