PAGE 10 OF 10
STEP 9*
REINSTALL THE
5
16
" BOLT & NUT
TIGHTEN THE INSTALLED BOLT
STEP 10*
THIS BOLT ADJUSTS THE STARTING POSITION OF
THE JAWS WHEN PLACING A MITCHELL WREATH RING
ONTO THE MACHINE IT CAN BE PLACED FOR THE
SMALL, REGULAR & LARGE STYLE CLAMP RINGS
LOOSEN THIS BOLT UNTIL THE JAWS REST AGAINST
THE UNFOLDED CLAMP RINGS
TIGHTEN THE NUT TO SECURE ADJUSTMENT BOLT IN PLACE
REV: 05
CONNECTING THE HOOK LEVER & FOOT PEDAL
ASSEMBLIES:
1.
REMOVE THE PRE-INSTALLED CLEVIS PIN,
WASHER, COTTERPIN, HEX BOLT, AND NUT
FROM THE LINKAGE ASSEMBLY & FOOT PEDAL
ASSEMBLY AS SHOWN IN THE DIAGRAM TO
THE LEFT
INSTALL THE LONG LINK:
1.
INSERT THE LONG LINK BETWEEN THE BARS OF THE
HOOK LEVER ASSEMBLY
2.
INSERT CLEVIS PIN THROUGH HOOK LEVER ASSEMBLY
AND LONG LINK AND SECURE WITH COTTER KEY
STEP 10***
* PLEASE NOTE SOME FRAMING MEMBERS NOT SHOWN FOR VISUAL CLARITY
** MULTIPLE HOLES HAVE BEEN INSERTED INTO THE LINKAGE ASSEMBLYL. THESE ARE TO RAISE OR LOWER
THE FOOT PEDAL TO A COMFORTABLE LEVEL
*** THE MULTIPLE HOLES ARE THERE TO ALLOW ADJUSTMENT OF THE HEIGHT OF THE FOOT PEDAL WITH THE
JAWS IN THEIR FURTHEST OPEN POSITION. THIS IS A PERSONAL PREFERENCE ADJUSTMENT DEPENDING ON
THE COMFORT OF THE OPERATOR
Содержание NO-HAMMER
Страница 1: ......