Connecting the unit
54
Installation instructions
3. Connect the connection lines in the building to tap water valves
using seals.
4. Connect the connection lines (cold and warm) to the unit.
5. Open the tap water valves and check the threaded connectors for
leaks.
6. Fill out the commissioning report.
6.5 Making the wastewater connection
Installation work with wastewater
Installation work on wastewater lines and the unit may only be
performed by a specialist company, which is responsible for
wastewater systems. The applicable regional regulations, standards
and guidelines must be observed, as well as the connection
conditions imposed by the wastewater system operator responsible.
Professional qualification for wastewater specialist
Installation work on wastewater lines and the unit may only be carried
out by a wastewater specialist from the specialist company assigned
to the work.
a
b
Image: Wastewater connection
a Wastewater connection
b Wastewater line in the building
•
With FlexiChef the wastewater discharge is in the right or left side
arm depending on the construction type.
•
With FlexiChef Team one wastewater discharge is in the right side
arm and one in the left side arm.
10000008311AINBEB
Содержание FlexiChef FCEKMP12 Series
Страница 64: ...Putting the unit into service 64 Installation instructions 10000008311AINBEB ...
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ...www mkn com ...