Connecting the unit
42
Installation instructions
2. Press the front edge of the cover plate towards the rear, while at
the same time attaching it to the side bolts.
6.2 Making the electrical connection
Electrical installation work
Electrical installation work on the electric system and the unit may
only be performed by a specialist company, which is approved by the
electric utility company in the particular region. The applicable
regional regulations, standards and guidelines must be observed, as
well as the connection conditions imposed by the electric utility
company responsible.
Professional qualification for electrical installation work
Electrical installation work on the electrical system and the unit may
only be carried out by an electrician from the specialist company
assigned to the work.
The unit must be connected on the basis of the information on the
nameplate and this manual.
Wiring diagram
The wiring diagram is included with the unit.
The wiring diagram and additional documents are available on the
manufacturer's Internet page by entering the serial number of the unit
(see Impressum).
Power connection cable
Minimum requirements for the unit's power connection cable to the
electric mains:
Connection
Power connection cable
Permanent connection for fixed
installation with a cable from the unit to
a separate connection box.
Rubber sheath cable, oil-resistant,
shrouded and flexible in accordance
with IEC 60245-57 (for example:
H05RN-F).
Permanent connection for fixed
installation with a permanently laid
cable and direct connection to the unit.
PVC sheathed cable for permanent
ducting in buildings or damp and wet
rooms.
Insulation monitoring
If there is an unearthed network (IT network), the unit can be
incorporated into the insulation monitoring.
10000008311AINBEB
Содержание FlexiChef FCEKMP12 Series
Страница 64: ...Putting the unit into service 64 Installation instructions 10000008311AINBEB ...
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ...www mkn com ...