19
Installation Instructions
1. Replace The 2 hole Chute Clamp with the appropriate washer. (54-68 has 1/2” hole, 75- has
5/8” hole.
Please Note:
the chute bearing is between 2 washers. An SAE Washer on bottom
and a thin Wave Washer on top
2. Bolt Electric Motor unit on top of Chute Base.
3.
Before tightening the bolts, check for binding gears or excessive clearance that may cause
the gears to jam.
4. Finish by tightening the bolts
Washer
Chute Base
By pulling out the knob on the end of the gear shaft and giving it a 1/4 turn, the chute can be
manually rotated to check for jamming.
Electric Chute Rotator
Содержание Meteor 54
Страница 2: ......
Страница 23: ...23...
Страница 26: ...26 PTO Installation Instructions for Snowblower...
Страница 30: ...30 Effective PTO Drive Shaft Maintenance...
Страница 36: ...NOTES 36...
Страница 38: ......
Страница 39: ......