App
- 15
Appendix 1 Special Relay List
APPENDICES
(8) Debug
TableApp.9 Special relay
Number
Name
Meaning
Explanation
Set by
(When Set)
Corres-
ponding
ACPU
M9
Corresponding
CPU
SM800
Trace preparation
OFF : Not ready
ON : Ready
• Switches ON when the trace preparation is
completed
S (Status change)
New
Qn(H)
QnPH
QnPRH
QnU
Sampling trace
preparation
• Goes ON when sampling trace is ready
S (Status change)
New
QnA
SM801
Trace start
OFF : Suspend
ON : Start
• Trace is started when this relay switches ON.
• Trace is suspended when this relay switches OFF.
(All related special Ms switches OFF.)
U
M9047
Qn(H)
QnPH
QnPRH
QnU
Sampling trace start
• Sampling trace started when this goes ON
• Suspended when OFF (Related special M all OFF)
U
M9047
QnA
SM802
Trace execution in
progress
OFF : Suspend
ON : Start
• Switches ON during execution of trace.
S (Status change)
M9046
Qn(H)
QnPH
QnPRH
QnU
Sampling trace
execution in progress
• Goes ON during execution of sampling trace
S (Status change)
M9046
QnA
SM803
Trace trigger
OFF
ON: Start
• Trace is triggered when this relay switches from OFF
to ON. (Identical to TRACE instruction execution
status)
U
M9044
Qn(H)
QnPH
QnPRH
QnU
Sampling trace trigger
• Sampling trace trigger goes ON when this goes from
OFF to ON (Identical to STRA instruction execution
status)
U
M9044
QnA
SM804
After trace trigger
OFF : Not after trigger
ON : After trigger
• Switches ON after trace is triggered.
S (Status change)
New
Qn(H)
QnPH
QnPRH
QnU
After sampling trace
trigger
• Goes ON after sampling trace trigger
S (Status change)
New
QnA
SM805
Trace completed
OFF : Not completed
ON : End
• Switches ON at completion of trace
S (Status change)
M9043
Qn(H)
QnPH
QnPRH
QnU
Sampling trace
completed
• Goes ON at completion of sampling trace
S (Status change)
M9043
QnA
SM806
Status latch
preparation
OFF : Not ready
ON : Ready
• Goes ON when status latch is ready
S (Status change)
New
SM807
Status latch command
OFF
ON: Latch
• Runs status latch command
U
New
SM808
Status latch
completion
OFF : Latch not completed
ON : Latch completed
• Comes ON when status latch is completed.
S (Status change)
M9055
SM809
Status latch clear
OFF
ON: Clear
• Enable next status latch
U
New
SM810
Program trace
preparation
OFF : Not ready
ON : Ready
• Goes ON when program trace is ready
S (Status change)
New
SM811
Start program trace
OFF : Suspend
ON : Start
• Program trace started when this goes ON
• Suspended when OFF (Related special M all OFF)
S (Status change)
New
SM812
Program trace
execution under way
OFF : Suspend
ON : Start
• ON when program trace execution is underway
U
New
SM813
Program trace trigger
OFF
ON: Start
• Program trace trigger goes ON when this goes from
OFF to ON (Identical to PTRA instruction execution
status)
S (Status change)
New
SM814
After program trace
trigger
OFF : Not after trigger
ON : After trigger
• Goes ON after program trace trigger
S (Status change)
New
SM815
Program trace
completion
OFF : Not completed
ON : End
• Goes ON at completion of program trace
S (Status change)
New
Содержание Q00CPU
Страница 1: ......
Страница 2: ......
Страница 972: ...Index 6 Memo ...
Страница 975: ......
Страница 976: ......