3
SEQUENCE PROGRAM CONFIGURATION AND
EXECUTION CONDITIONS
3.6 Operation Processing during Momentary Power Failure
3
- 69
1
O
verv
iew
2
Per
fo
rma
nce
S
p
ecifica
tio
n
3
S
equ
en
ce P
ro
g
ra
m
Co
nfig
ura
tio
n a
nd
E
xecut
io
n Co
nd
iti
o
ns
4
I/O N
unb
er
Assig
n
m
e
nt
5
Me
mor
ie
s a
nd
File
s
Ha
nd
led
by CP
U Mo
du
le
6
Func
tions
7
Co
mmu
nic
a
tion
us
in
g
bu
ilt
-i
n E
th
e
rne
t po
rt
s o
f
CP
U mod
u
le
8
Co
mm
un
icatio
n
w
ith
Int
e
lli
ge
nt
Fun
ction
Mo
du
le
(2) When momentary power failure occurs for a period longer than the
permitted power failure time
CPU module starts initially.
The same operation processing as that after the following operation occurs.
• Power ON
• Resetting using RESET/L. CLR switch (RUN/STOP/RESET switch in the case of
the Basic model QCPU and Universal model QCPU)
• Remote setting using GX Developer
POINT
1. In the redundant power supply system, operation is not suspended if a
momentary power failure occurs in either of the power supply modules, while it
is suspended if a momentary power failure occurs under the condition where
the power was supplied to only one of them.
2. The information of a momentary power failure for the redundant power supply
system is stored in SM1782 to 1783 and SD1782 to 1783.
The information of a momentary power failure for not redundant power supply
system is stored in SM53 and SD53. (
Содержание Q00CPU
Страница 1: ......
Страница 2: ......
Страница 972: ...Index 6 Memo ...
Страница 975: ......
Страница 976: ......