
2
PUHZ-SW100YHA(-BS).UK
PUHZ-SW100YHAR1(-BS).UK
PUHZ-SW120YHA(-BS).UK
PUHZ-SW120YHAR1(-BS).UK
•
Power circuit board (P.B.) has been changed.
1
TECHNICAL CHANGES
PUHZ-SW75VHA(-BS).UK
PUHZ-SW75VHAR3(-BS).UK
PUHZ-SW100VHA(-BS).UK
PUHZ-SW100VHAR3(-BS).UK
PUHZ-SW100YHAR1(-BS).UK
PUHZ-SW100YHAR3(-BS).UK
PUHZ-SW120VHA(-BS).UK
PUHZ-SW120VHAR3(-BS).UK
PUHZ-SW120YHAR1(-BS).UK
PUHZ-SW120YHAR3(-BS).UK
•
Added a new function "Energy Monitor" which allows remote controller to display power consumption and heat output.
Service ref. have been changed as follows.
PUHZ-SW75VHAR3(-BS).UK
PUHZ-SW75VHAR4(-BS).UK
PUHZ-SW100VHAR3(-BS).UK
PUHZ-SW100VHAR4(-BS).UK
PUHZ-SW100YHAR3(-BS).UK
PUHZ-SW100YHAR4(-BS).UK
PUHZ-SW120VHAR3(-BS).UK
PUHZ-SW120VHAR4(-BS).UK
PUHZ-SW120YHAR3(-BS).UK
PUHZ-SW120YHAR4(-BS).UK
•
A compliance with ErP directive Lot 1 has been authorized.
•
All circuit boards (C.B./P.B./N.F./CONV.B) have been changed (including a change of production site).
OCH533D