8 - 9 8 - 9
8 FUNCTIONS
[Data link startup]
1) When the programmable controller system is powered on, the network
parameters in the programmable controller CPU are transferred to the
master station and the CC-Link system starts up automatically.
[On/off data from a local station to the master station or other local
stations]
2) The on/off data of the CPU device set with the automatic refresh
parameters is stored in the "remote output RY" buffer memory of the
local station. The remote output RY is used as output data in local
station systems.
3) The data in the "remote output RY" buffer memory of the local station is
automatically stored (for each link scan) in the "remote input RX" buffer
memory of the master station and the "remote output RY" buffer
memory of other local stations.
4) The input status stored in the "remote input RX" buffer memory is
stored in the CPU device set with the automatic refresh parameters.
The remote input RX is used as input data in local station systems.
5) The input status stored in the "remote output RY" buffer memory is
stored in the CPU device set with the automatic refresh parameters.
Remote input RX
RX0F to RX00
RX1D to RX10
RX2F to RX20
RX3F to RX30
RX4F to RX40
RX5F to RX50
RX6F to RX60
RX7F to RX70
RX8F to RX80
RX9D to RX90
RXAF to RXA0
RX7FF to RX7F0
Remote output RY
RY0F to RY00
RY1D to RY10
RY2F to RY20
RY3F to RY30
RY4F to RY40
RY5F to RY50
RY6F to RY60
RY7F to RY70
RY8F to RY80
RY9D to RY90
RYAF to RYA0
RY7FF to RY7F0
RY0F to RY00
RY1D to RY10
RY2F to RY20
RY3F to RY30
RY4F to RY40
RY5F to RY50
RY6F to RY60
RY7F to RY70
RY8F to RY80
RY9D to RY90
RYAF to RYA0
RY7FF to RY7F0
X
Y
Y
Programmable
controller CPU
Master station
Local station
(Station number 1:
occupies 1 station)
Local station
(Station number 2:
occupies 4 stations)
Programmable
controller CPU
4)
3)
3)
5)
2)
The last two bits cannot be used in the communication between the master
and local stations.
to
to
to
3)
3)
Remote output RY
Содержание L26CPU-BT
Страница 1: ......
Страница 2: ......
Страница 7: ...A 5 A 5 Disposal Precautions CAUTION When disposing of this product treat it as industrial waste ...
Страница 32: ...3 5 3 5 3 SPECIFICATIONS ...
Страница 51: ...4 2 4 2 4 PROCEDURE BEFORE OPERATION 4 ...
Страница 61: ...6 4 6 4 6 INSTALLATION AND CONNECTION ...
Страница 63: ...6 6 6 6 6 INSTALLATION AND CONNECTION 8 The connection method is shown below ...
Страница 70: ...6 13 6 13 6 INSTALLATION AND CONNECTION ...
Страница 72: ...6 15 6 15 6 INSTALLATION AND CONNECTION ...
Страница 139: ...8 33 8 33 8 FUNCTIONS ...
Страница 151: ...8 45 8 45 8 FUNCTIONS ...
Страница 243: ...11 6 11 6 11 EXAMPLE OF COMMUNICATION BETWEEN THE MASTER STATION AND REMOTE DEVICE STATIONS Set parameters as follows ...
Страница 246: ...11 9 11 9 11 EXAMPLE OF COMMUNICATION BETWEEN THE MASTER STATION AND REMOTE DEVICE STATIONS ...
Страница 311: ...13 2 13 2 13 COMMUNICATION BETWEEN THE MASTER STATION AND INTELLIGENT DEVICE STATIONS MEMO 13 ...
Страница 321: ...14 10 14 10 14 EXAMPLE OF COMMUNICATION WHEN MOUNTING MODULES ON THE HEAD MODULE ...
Страница 324: ...15 3 15 3 15 TROUBLESHOOTING 1 When the master station RUN LED is off 2 Common module check procedure ...
Страница 326: ...15 5 15 5 15 TROUBLESHOOTING To the next page ...
Страница 327: ...15 6 15 6 15 TROUBLESHOOTING To the next page ...
Страница 328: ...15 7 15 7 15 TROUBLESHOOTING ...
Страница 329: ...15 8 15 8 15 TROUBLESHOOTING 2 Troubleshooting by status logging ...
Страница 436: ...App 72 App 72 APPENDIXES 7 Operating procedure of the transmission speed test ...
Страница 439: ...App 75 App 75 APPENDIXES MEMO ...
Страница 447: ......
Страница 448: ......
Страница 449: ......