5 - 17 5 - 17
MELSEC-Q
5 UTILITY PACKAGE (GX Configurator-AD)
5.6 Monitor/Test
5.6.1 Monitor/test screen
[Purpose of setting]
Buffer memory monitoring/testing, I/O signal monitoring/testing, operating condition
setting, offset/gain settings (see Section 5.6.2) and pass data (see Section 5.6.3,
5.6.4) are started from this screen.
[Startup procedure]
Monitor/test module selection screen "Start I/O No. " "Module type"
"Module model name"
Monitor/test
Enter the start I/O numbers in hexadecimal.
The screen can also be started from the GX Developer Version 6 or later
system monitor.
See GX Developer's operating manual for details.
[Setting screen]
X/Y monitor/test
Max value/min value info.
1)
Содержание GX Configurator-AD
Страница 2: ......
Страница 23: ...2 6 2 6 MELSEC Q 2 SYSTEM CONFIGURATION MEMO ...
Страница 120: ...5 31 5 31 MELSEC Q 5 UTILITY PACKAGE GX Configurator AD MEMO ...
Страница 145: ...6 25 6 25 MELSEC Q 6 PROGRAMMING MEMO ...
Страница 207: ......