![Mitsubishi GOT2000 Series Скачать руководство пользователя страница 272](http://html.mh-extra.com/html/mitsubishi/got2000-series/got2000-series_connection-manual_1808685272.webp)
8 - 26
8. BUS CONNECTION
8.2 System Configuration
8.2.6
Connecting to motion controller CPU (A171SCPU(-S3(N)), A171SHCPU(N),
A172SHCPU(N), A173UHCPU(-S1))
When one GOT is connected
Main base unit
Bus extension
connector box
GOT
Extension base
unit
Connection cable 1)
Connection cable 2)
Extension cable
Communication driver
Bus(A/QnA)
PLC
Connection cable 2)
GOT1000 Series
Max. distance
Main
base
Extension
cable
*1
Extensi
on
base
*2
Connection cable 1)
Bus
connector
conversion
box
Option device
*5
Model
Main
base
-
-
-
-
GT15-A1SC07B(0.7m)
GT15-A1SC12B(1.2m)
GT15-A1SC30B(3m)
GT15-75ABUSL
GT15-75ABUS2L
GT15-ABUS
GT15-ABUS2
Between main base
and GOT: 3m
-
-
GT15-C100EXSS-1(10m)
GT15-C200EXSS-1(20m)
GT15-C300EXSS-1(30m)
*4
GT15-75ABUSL
GT15-75ABUS2L
GT15-ABUS
GT15-ABUS2
Between main base
and GOT: 30m
GT15-A1SC05NB(0.45m)
GT15-A1SC07NB(0.7m)
GT15-A1SC30NB(3m)
A7GT
-CNB
*3
GT15-C100EXSS-1(10m)
GT15-C200EXSS-1(20m)
GT15-C300EXSS-1(30m)
*4
GT15-75ABUSL
GT15-75ABUS2L
GT15-ABUS
GT15-ABUS2
Between main base
and GOT: 33m
(Including between
main base and bus
connector
conversion box)
Between main base
and bus connector
conversion box: 3m
Содержание GOT2000 Series
Страница 2: ......
Страница 62: ...1 38 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring ...
Страница 64: ......
Страница 80: ...2 16 2 DEVICE RANGE THAT CAN BE SET 2 6 MELSEC WS ...
Страница 246: ...7 26 7 COMPUTER LINK CONNECTION 7 6 Precautions ...
Страница 252: ...8 6 8 BUS CONNECTION 8 1 Connectable Model List ...
Страница 256: ...8 10 8 BUS CONNECTION 8 2 System Configuration ...
Страница 288: ...8 42 8 BUS CONNECTION 8 4 Precautions ...
Страница 324: ...9 36 9 MELSECNET H CONNECTION PLC TO PLC NETWORK MELSECNET 10 CONNECTION PLC TO PLC NETWORK ...
Страница 416: ......
Страница 510: ...15 46 15 SERVO AMPLIFIER CONNECTION 15 7 Precautions ...
Страница 518: ...16 8 16 ROBOT CONTROLLER CONNECTION 16 6 Precautions ...
Страница 540: ...17 22 17 CNC CONNECTION 17 7 Precautions ...
Страница 541: ...MULTIPLE GOT CONNECTIONS 18 GOT MULTI DROP CONNECTION 18 1 ...
Страница 542: ......
Страница 567: ...MULTI CHANNEL FUNCTION 19 MULTI CHANNEL FUNCTION 19 1 ...
Страница 568: ......
Страница 592: ...19 24 19 MULTI CHANNEL FUNCTION 19 3 GOT Side Settings Example Setting example for Ethernet connection 4 channels ...
Страница 599: ...FA TRANSPARENT FUNCTION 20 FA TRANSPARENT FUNCTION 20 1 ...
Страница 600: ......
Страница 668: ...20 68 20 FA TRANSPARENT FUNCTION 20 7 Precautions ...
Страница 670: ...REVISIONS 2 ...
Страница 673: ......