FX2N-16CCL-M CC-Link System Master Block
Communication between Master Station and Remote Device Stations 11
11-9
11.3
Execution of Data Link
Turn on the power of the remote device stations first, turn on the power of the master station,
then start the data link.
11.3.1
Confirmation of operation by LED indication
The figures below show the LED indication status in the master station and the remote device
stations while the data link is proceeding normally.
1) LED indication in the master station
Make sure that the LED indication status is as shown below.
2) LED indication in the remote device station
Make sure that the LED indication status is as shown below.
RUN
ERR.
MST
TEST1
TEST2
L RUN
L ERR.
POWER
SW
M/S
PRM
TIME
LINE
SD
RD
E
R
R
O
R
FX
2N
-16CCL-M
The module is normal.
The module is set as the master
station.
Data link is normally proceeding.
Data is being transmitted.
Data is being received.
A
J65BT-64AD
PW
L RUN
SD
RD
L ERR.
RUN
P
OWER
FX
2N
-32CCL
LRUN
LERR
R
D
S
D
5V DC is supplied from the PLC.
Data link is normally proceeding.
Data is being transmitted.
Data is being received.
24V DC is supplied.
The module is normal.
Data link is normally
proceeding.
Data is being transmitted.
Data is being received.
Содержание FX2N-16CCL-M
Страница 4: ...FX2N 16CCL M CC Link System Master Block ii ...
Страница 6: ...FX2N 16CCL M CC Link System Master Block iv ...
Страница 34: ...FX2N 16CCL M CC Link System Master Block System Configuration 3 3 14 MEMO ...
Страница 66: ...FX2N 16CCL M CC Link System Master Block Specification 4 4 32 MEMO ...
Страница 144: ...FX2N 16CCL M CC Link System Master Block Programming 9 9 16 MEMO ...
Страница 172: ...FX2N 16CCL M CC Link System Master Block Communication in Compound System 12 12 10 MEMO ...
Страница 192: ...FX2N 16CCL M CC Link System Master Block Appendix 14 14 4 MEMO ...
Страница 193: ......