![Mitsubishi FR-E800 Series Скачать руководство пользователя страница 73](http://html1.mh-extra.com/html/mitsubishi/fr-e800-series/fr-e800-series_sample-screen-manual_1809262073.webp)
73/79
BCN-P5999-1305-1c
7.6 Changing the Communication Settings of the Inverter from CH1 in [Controller Setting]
In this sample,
the statuses of the inverters are monitored by connecting the GOT’s CH1 to multiple inverters, and
switching the station number of monitoring destination of CH1.
When connecting inverters to the channels other than the CH1, change the settings as below.
■Setting Example: When connecting the inverter to CH2
(1) Open [Station No. Switching] in the [Controller Setting] tree and check the CH that is being connected to the
inverter under [CH No. for Station No.Switching].
(2) Go to [Search/Replace] - [Batch edit] to select [CH No]. Check [Project] of [Target] and click [Find Now] to
display "1" in [Before] and [After]. Change the "1" in "After" to "2" and click "Replace".
Uncheck the CH that is not being
connected to the inverter.
Check the CH that is being
connected to the inverter.