
16/79
BCN-P5999-1305-1c
5.1.5 Op. Cmnd (Op. Procedure) (B-12120)
Outline
This screen explains how to execute operation commands to the inverter connected to the GOT.
Operation commands are performed according to the order (STEP) on the screen.
Description
1. Sets the speed or the operation frequency of the inverter operation.
Low Speed/Middle Speed/High Speed : Selects the speed of the inverter operation from 3-speed
operation ([Low Speed], [Middle Speed] or [High Speed]).
Touch [STOP] switch to deselect the selected speed operation
switch.
Running Frequency (Hz)
: Sets the operation frequency of the inverter. Sets the frequency by
inputting a numeric value or incrementing or decrementing the
frequency by 1Hz with touch switches on the left and right sides of
the value input area (the switches can be held down). When
3-speed operation is enabled, the settings of 3-speed operation
have priority.
2. Notifies the inverter of the operation command. The motor rotates and stops according to the operation
of each switch.
3. Switches to [Op. Cmnd (Op. during inv. op.)] screen.
Remarks
・
When the inverter is in the NET operation mode, commands can be input to the inverter by the GOT. When
using this screen, please use the inverter in the NET operation mode.
・
When connecting GOT2000 to the inverter via CC-Link IE TSN, [Forward] or [Reverse] cannot be
performed. Please refer to "8.1 Limitations of Link Devices" for details.
・
Selection status of 3-speed operation switch is the status selected in the GOT last time.
1
2
3