![Mitsubishi Heavy Industries S3L Скачать руководство пользователя страница 156](http://html1.mh-extra.com/html/mitsubishi-heavy-industries/s3l/s3l_service-manual_1812127156.webp)
ELECTRICAL SYSTEM
12-24
2.6 Disassembling, inspecting and reassembling alternator (12V-50A)
Disassembling, inspecting and reassembling alternator (12V - 50A)
Disassembling sequence
1 Nut
5 Rotor, bearing
9 Rectifier
2 Pulley, spacer
6 Stator
10 Nut set
3 Through bolt
7 Rear bracket
4 Front bracket, bearing
8 Regulator
1
2
3
4
6
9
7
8
10
5
Crack, damage
Rotation
Deformation
and damage
Broken wire
and ground of coil
Rotation
Crack, damage
Sliding state and wear of brushes
Dirt, damage and seizure of
slip ring, and coil resistance
Short cincuit and
open circuit
Содержание S3L
Страница 2: ......
Страница 4: ......
Страница 16: ......
Страница 37: ...3 1 SERVICE TOOLS 1 Basic tools 3 2 2 Special tools 3 3 ...
Страница 40: ......
Страница 41: ...4 1 DETERMINATION OF OVERHAUL 1 Determining overhaul timing 4 2 2 Testing compression pressure 4 3 ...
Страница 44: ......
Страница 60: ......
Страница 94: ......
Страница 122: ......
Страница 128: ......
Страница 167: ...ELECTRICAL SYSTEM 12 35 3 5 Installing alternator Installing alternator ...
Страница 168: ...ELECTRICAL SYSTEM 12 36 3 6 Installing starter Installing starter 9 81 to 11 8 N m 1 0 to 1 2 kgf m 7 2 to 8 7 Ibf ft ...
Страница 188: ......
Страница 200: ......