12
VS-60HS12U Set-up Manual
Sa
fet
y p
rec
au
tion
2
2
C
C
u
u
b
b
e
e
i
i
n
n
s
s
t
t
a
a
l
l
l
l
a
a
t
t
i
i
o
o
n
n
2
2
.
.
1
1
S
S
a
a
f
f
e
e
t
t
y
y
p
p
r
r
e
e
c
c
a
a
u
u
t
t
i
i
o
o
n
n
•
This product requires special installation to prevent falling
or toppling. This should be done by installation specialists.
•
Be sure to read this manual and the user’s manual for your
safety before starting assembly or installation.
•
Be sure to use supplied accessories for assembly or
installation.
•
Attach all the screws and fixtures specified in this manual
securely.
•
Use qualified electricians to perform electrical work.
•
This apparatus must be grounded.
Only use
electrical
outlets with earth leakage circuit breakers.
•
Only use the specified power supply cord.
•
Reinforce the wall surface and floor so that it can support
the total weights of the products permanently and resist
earthquakes, possible vibrations, and external forces.
•
Ensure that the safety factor is more than 10 (or ensure that
the total bolts can bear ten times the weight of products
and the brackets).
•
Inspect the mounting fixings more than once in a year as
needed.
•
Do not use the product near a heater or in a humid, dusty
or smoky location.
•
Do not install the product with its intakes, exhaust slots
and ventilation holes blocked. Inside the unit may overheat
and cause a fire or breakdown.
•
Be sure that a lighting or sunlight does not leak into the
screens.
•
Be sure to mount/demount the screen by 2 or more people.
These works may be perilous particularly on a height or a
narrow scaffold.
•
About one-meter space is needed in front of the screens
for the opening. Prior to work, make sure that there is no
object such as steps in the working space.
•
Open/close the screen units one-by-one in a display wall
with making sure if adjacent screens are surely shut so as
not to shift the center of gravity too much.
•
To prevent cubes from toppling during screen
open/close, use the support base contained in the
cube carton boxes when the cubes are not fixed to a
base stand or other cubes.
•
Be careful not to pinch your fingers while sliding the
screen holding arms.
Vertical tiling
•
As the number of products installed in vertical tiling
increases, the temperature condition gets worse in
the upper monitors. For installation, no stacking over
three (3) tiers is acceptable. Inquire about the
installation over three (3) tiers.
Ventilation
•
Exhaust hot air gets stacked above the product.
Leave a space of at least the dimensions illustrated
below around the product so as to release the
exhaust heat and flow enough fresh air from the
back and bottom.
Support base
5cm
5cm
5cm
Содержание VS-60HS12U
Страница 1: ...DLPTM Display Wall Cube VS 60HS12U Set up Manual REV 1 0 Dec 22 2014 ...
Страница 57: ...REV 1 0 57 Menu trees Installation Installation White Balance Detail Misc 1 ...
Страница 63: ...REV 1 0 63 Revision history M E M O ...
Страница 64: ......