33
[4] Air bleeding operation and flow rate adjustment operation during test run
(1)Air bleeding operation
Check there is no water leakage during operation.
For each circuit, perform at least three sets of at least 5 minutes in duration. During the air bleeding operation, use the
method below (*1) to display the water flow rate during operation and check it is stable (no air entrainment).
(1)-1. Primary side water circuit air bleeding operation
(1)-2. Secondary side water circuit air bleeding operation
Step
Contents
Operation and check points
Supplemental explanation
a
Water level check
Check the water level is not the full level.
(Water is supplied even when the target water level
has been reached.)
-
b
Power operation
Turn the power ON.
If the startup operation has not finished,
SW2-9 and SW2-3 need to be set as a
stopgap measure (see Note 1).
c
PCB DIP switch
setting
Change the setting of SW1-8 from OFF to ON.
* Make sure SWS2 is set to the lower
side. (See page 23.)
d
Operation
procedure 2
Change the setting of PCB slide SWS1 from
REMOTE to LOCAL.
* When the pump sound has become quiet, end
operation.
The compressor does not operate.
* The pump and motor-operated valve 2
are automatically set to OPEN (starting
water flow).
e
Stop operation 1
Change the setting of PCB DIP SW1-8 from ON to
OFF.
* The pump and motor-operated valve 2
are automatically set to CLOSED
(ending water flow).
f
Stop operation 2
Change the setting of PCB slide SWS1 from
LOCAL to REMOTE.
-
Step
Contents
Operation and check points
Supplemental explanation
a
Water level check
Check the water level is not the full level.
(Water is supplied even when the target water level
has been reached.)
-
b
Power operation
Turn the power ON.
If the startup operation has not finished,
SW2-9 and SW2-3 need to be set as a
stopgap measure (see Note 1).
c
Operation
procedure 1
Check that the secondary side control is enabled.
For details, refer to page 28 (4-[3]-(3)-3).
d
PCB DIP switch
setting
Change the setting of SW1-8 from OFF to ON.
* Make sure SWS2 is set to the lower
side. (See page 23.)
e
Operation
procedure 2
Change the setting of PCB slide SWS1 from
REMOTE to LOCAL.
* When the pump sound has become quiet, end
operation.
The compressor does not operate.
* The pump and motor-operated valve 2
are automatically set to OPEN (starting
water flow).
f
Stop operation 1
Change the setting of PCB DIP SW1-8 and SW3-3
from ON to OFF.
* The pump and motor-operated valve 2
are automatically set to CLOSED
(ending water flow).
g
Stop operation 2
Change the setting of PCB slide SWS1 from
LOCAL to REMOTE.
-
SW1
8
9
ON
OFF
SW1
SW3
8
9
3
ON
OFF
ON
WT08219X05.book 33 ページ 2018年10月1日 月曜日 午後7時47分