Demand Control Overview
(1) General outline of control
Demand control is performed by using the external signal input to the 1-2 and 1-3 pins of CN3D on the outdoor units (OC and OS).
Between 2 and 8 steps of demand control is possible by setting Dip SW6-8 on the outdoor units (OC and OS).
*1 Available demand functions
P200 - P500YLM-A(1), EP200 - EP500YLM-A models (single-outdoor-unit system) : 2 and 4 steps shown in the rows 1 and 2
in the table above only.
P400 - P900YSLM-A(1), EP500 - EP900YSLM-A models (two-outdoor-unit system OC+OS) : 2-8 steps shown in the rows 1,
2, 3, and 4 in the table above only.
*2 Signal is input to CN3D on the outdoor unit whose SW6-8 is set to ON. When SW6-8 is set to OFF on all outdoor units, the
signal is input to the CN3D on the OC.
Outdoor units whose SW6-8 is set to ON are selectable in a single refrigerant system.
*3 If wrong sequence of steps are taken, the units may go into the Thermo-OFF (compressor stop) mode.
Ex) When switching from 100% to 50%
(Incorrect) 100%→0%→50% The units may go into the Thermo-OFF mode.
(Correct) 100%→75%→50%
*4 The percentage of the demand listed in the table above is an approximate value based on the compressor volume and does
not necessarily correspond with the actual capacity.
*5 Notes on using demand control in combination with the low-noise mode
To enable the low-noise mode, it is necessary to short-circuit 1-2 pin of CN3D on the outdoor unit whose SW6-8 is set to OFF.
When SW6-8 is set to ON on all outdoor units, the following operations cannot be performed.
Performing 4-step demand in combination with the low-noise operation in a single-outdoor-unit system.
Performing 8-step demand in combination with the low-noise operation in a two-outdoor-unit system.
1) Contact input and control content
2-step demand control
The same control as the Thermo-OFF is performed by closing 1-3 pin of CN3D.
4-step demand control (When SW6-8 is set to ON on an outdoor unit)
Demand capacity is shown below.
8-step demand control (When SW6-8 is set to ON on two outdoor units)
Demand capacity is shown below.
*1. The outdoor units whose SW6-8 is set to ON are designated as No. 1 and No. 2 in the order of address from small to large.
Ex) When outdoor units whose SW6-8 is set to ON are designated as OC and OS, OC=No. 1 and OS=No. 2.
No
Demand control switch
Dip SW6-8
Input to CN3D*
2
OC
OS
1
2 steps (0-100%)
OFF
OFF
OC
2
4 steps (0-50-75-100%)
ON
OFF
OC
3
OFF
ON
OS
4
8 steps
(0-25-38-50-63-75-88-100%)
ON
ON
OC and OS
CN3D
1-3
Open
100%
Close
0%
CN3D
1-2P
1-3P
Open
Close
Open
100%
75%
Close
0%
50%
8-step demand
No.2 CN3D
1-2P
Open
Close
No.1 CN3D
1-2P
1-3P
Open
Close
Open
Close
Open
Open
100%
50%
88%
75%
Close
50%
0%
38%
25%
Close
Open
88%
38%
75%
63%
Close
75%
25%
63%
50%
Содержание PURY-EP200YLM-A
Страница 9: ...viii ...
Страница 13: ... 2 HWE1314A GB ...
Страница 29: ... 1 5 Cautionary notes on installation environment and maintenance 18 HWE1314A GB ...
Страница 31: ... 20 HWE1314A GB ...
Страница 44: ... 2 6 System Connection Example 33 HWE1314A GB 2 Restrictions ...
Страница 58: ... 2 7 Example System with an MA Remote Controller 47 47 HWE1314A GB 2 Restrictions ...
Страница 77: ... 66 HWE1314A GB ...
Страница 105: ... 94 HWE1314A GB ...
Страница 125: ... 4 6 BC Controller Circuit Board Components 114 HWE1314A GB 4 6 2 Four Relay Board 4 6 3 Ten Relay Board ...
Страница 137: ... 126 HWE1314A GB ...
Страница 171: ... 160 HWE1314A GB ...
Страница 227: ... 6 11 Standard Operation Data Reference Data 216 HWE1314A GB ...
Страница 230: ... 219 HWE1314A GB 7 9 9 Error Code 7113 292 7 9 10 Error Code 7117 293 7 9 11 Error Code 7130 294 ...
Страница 231: ... 220 HWE1314A GB ...
Страница 393: ... 8 16 Troubleshooting Problems Using the LED Status Indicators on the Outdoor Unit 382 HWE1314A GB ...
Страница 395: ... 384 HWE1314A GB ...