17
(A)
Fig.1
OPERATING PROCEDURE
PHOTOS
DISASSEMBLY PROCEDURE
8
8-1 CONTROL BOX
Be careful removing heavy parts.
1.Removing the control box cover
(1)Remove the fixing screws(two) of the cover(A) and
remove the cover.
(C)
(D),(E)
Fig.1
Fig.2
8-2 THERMISTOR (Liquid piping temperature detection)
OPERATING PROCEDURE
PHOTOS
1.Removing the cover
(1)Remove the fixing screws(two) of the cover(C) and
remove the cover.
2.Removing the thermistor
(1)Remove the thermistor(D), from the thermistor
holder(E), which are installed on the copper tube.
Содержание PDFY-10NMU-A
Страница 2: ......
Страница 9: ...7 OUTLINES AND DIMENSIONS 4 PDFY 10 16 24 32NMU A ...
Страница 10: ...8 PDFY 40 48NMU A ...
Страница 11: ...9 WIRING DIAGRAM 5 PDFY 10 16 24 32NMU A ...
Страница 12: ...10 PDFY 40 48NMU A ...