199
CHAPTER 8 FUNCTIONS
8
8.
3 T
e
mperat
ure Cont
rol
M
ode
(1) Operation of the simultaneous temperature rise function
The channel with the temperature rise reaching the set value (SV) last among channels satisfying the condition
for start-up in the same group is used as a standard when the simultaneous temperature rise function is started
up. The temperature of other channels rises following the temperature of the standard channel. The standard
channel is determined based on the simultaneous temperature rise parameter and the deviation (E).
Ex.
When all channels are selected for Group 1
*1
This becomes Simultaneous temperature rise in process (1) when the temperature rise starts; however, it becomes
Simultaneous temperature rise not in process (0) before the temperature rise starts.
1
0
0
OFF
ON
CH1 Set value (SV)
Temperature rise completion
times are matched.
Temperature process value (PV)
Time
Arrival point
CH2 Set value (SV)
CH3 Set value (SV)
CH4 Set value (SV)
Temperature rise start point
CH□ Simultaneous temperature
rise status (RX24 to RX27)
*1
CH□ Operation monitor
(RX11 to RX14)
Controlled by the temperature control module
Содержание NZ2GF2B-60TCRT4
Страница 1: ...CC Link IE Field Network Temperature Control Module User s Manual NZ2GF2B 60TCTT4 NZ2GF2B 60TCRT4 ...
Страница 2: ......
Страница 86: ...84 Memo ...
Страница 233: ...231 CHAPTER 8 FUNCTIONS 8 8 4 CC Link IE Field Network Function 3 Click the OK button on the following window ...
Страница 268: ...266 Memo ...
Страница 377: ...375 APPENDICES A Appendix 6 External Dimensions Memo ...
Страница 383: ...I 4 4 7 8 381 Memo ...
Страница 387: ......