84
OPERATING PROCEDURE
PHOTOS
6. Removing the reactor
(1) Remove the top panel (Photo 1).
(2) Remove the service panel, cabinet, back panel, and the
electrical parts (Photo 1, 2, 3, 4).
(3) Disconnect the reactor lead wire from the terminal of the
reactor.
(4) Remove the screws of the reactor, and remove the reactor
(Photo 9).
Photo 9
4. Removing the 4-way valve
(1) Remove the top panel (Photo 1).
(2) Remove the service panel, the cabinet, and the back panel
(Photo 1, 2, 3).
(3) Recover gas from the refrigerant circuit.
NOTE:
Recover gas from the pipes until the pressure gauge
shows 0 PSIG.
(4) Remove the electrical parts (Photo 4).
(5) Detach the brazed parts of 4-way valve and pipe (Photo 7).
5. Removing the expansion valve
(1) Remove the top panel (Photo 1).
(2) Remove the service panel, the cabinet, and the back panel
(Photo 1, 2, 3).
(Gas recovery is not required if the unit is pumped down.)
(3) Remove the electrical parts for removing LEV E (Photo 4, 5).
(4) Remove the LEV coils.
(5) Detach the brazed parts of expansion valves and pipes.
4 way valve
R.V. coil
Photo 7
Photo 8
Brazed parts
Expansion
valves
LEV coils
Screws of the reactor
OBH560G
Содержание MXZ-5B42NA
Страница 15: ...15 WIRING DIAGRAM 6 MXZ 2B20NA MXZ 2B20NA 1 OBH560G ...
Страница 16: ...16 MXZ 3B24NA MXZ 3B30NA MXZ 4B36NA OBH560G ...
Страница 17: ...17 MXZ 3B24NA 1 MXZ 3B30NA 1 MXZ 4B36NA 1 OBH560G ...
Страница 18: ...18 MXZ 5B42NA OBH560G ...