MXZ-5E102VA COOLING
Indoor units
Outdoor unit
Current
Power
combination
Unit A
Unit B
Unit C
Unit D
Unit E
Total
power consumption(kW)
(A)
factor(%)
Cooling capacity (kW)
9.60
2.672
(3.90-10.80)
(0.700-4.220)
9.90
2.766
(3.90-10.80)
(0.700-4.215)
10.00
2.800
(3.90-10.80)
(0.700-4.210)
10.00
2.780
(3.90-10.80)
(0.700-4.200)
10.00
2.770
(3.90-10.80)
(0.700-4.190)
10.00
2.740
(3.90-10.80)
(0.700-4.180)
10.00
2.720
(3.90-10.80)
(0.700-4.170)
9.90
2.872
(3.90-10.90)
(0.670-4.250)
10.10
2.940
(3.90-10.90)
(0.670-4.240)
10.10
2.940
(3.90-10.90)
(0.670-4.240)
10.10
2.920
(3.90-10.90)
(0.670-4.230)
10.10
2.910
(3.90-10.90)
(0.670-4.220)
10.10
2.880
(3.90-10.90)
(0.670-4.210)
10.10
2.860
(3.90-10.90)
(0.670-4.200)
10.10
2.940
(3.90-10.90)
(0.670-4.240)
10.10
2.940
(3.90-10.90)
(0.670-4.240)
10.10
2.920
(3.90-10.90)
(0.670-4.230)
10.10
2.910
(3.90-10.90)
(0.670-4.220)
10.10
2.880
(3.90-10.90)
(0.670-4.210)
10.10
2.860
(3.90-10.90)
(0.670-4.200)
10.10
2.940
(3.90-10.90)
(0.670-4.240)
10.10
2.920
(3.90-10.90)
(0.670-4.230)
10.10
2.910
(3.90-10.90)
(0.670-4.220)
10.10
2.880
(3.90-10.90)
(0.670-4.210)
10.10
2.860
(3.90-10.90)
(0.670-4.200)
10.10
2.900
(3.90-10.90)
(0.670-4.220)
10.20
3.080
(3.90-11.00)
(0.640-4.270)
10.10
2.860
(3.90-10.90)
(0.670-4.200)
10.10
2.840
(3.90-10.90)
(0.670-4.190)
10.10
2.880
(3.90-10.90)
(0.670-4.200)
10.10
2.850
(3.90-10.90)
(0.670-4.190)
10.20
3.080
(3.90-11.00)
(0.640-4.270)
10.20
3.080
(3.90-11.00)
(0.640-4.270)
10.20
3.080
(3.90-11.00)
(0.640-4.270)
10.20
3.060
(3.90-11.00)
(0.640-4.260)
10.20
3.050
(3.90-11.00)
(0.640-4.250)
10.20
3.020
(3.90-11.00)
(0.640-4.240)
10.20
3.000
(3.90-11.00)
(0.640-4.230)
18+18+20+20+35
12.30
99
18+18+20+20+42
12.21
99
1.62
1.62
1.80
1.80
18+18+20+20+22
11.73
99
18+18+20+20+25
12.15
99
1.76
1.76
1.96
1.96
3.15
1.53
1.53
1.69
1.69
3.56
2.16
1.76
1.76
1.96
1.96
2.45
18+18+20+22+42
12.82
99
18+18+20+22+50
12.78
99
1.52
1.52
1.68
1.85
18+18+20+22+25
12.91
99
18+18+20+22+35
12.91
99
1.77
1.77
1.96
2.16
18+18+20+20+71
11.95
99
18+18+20+22+22
12.61
99
1.22
1.22
1.36
1.36
18+18+20+20+50
12.17
99
18+18+20+20+60
12.03
99
1.43
1.43
1.59
1.59
2.45
1.61
1.61
1.79
1.97
3.13
4.83
1.78
1.78
1.98
2.18
2.18
3.97
1.32
1.32
1.47
1.47
4.41
3.54
1.42
1.42
1.58
1.74
3.95
18+18+20+25+60
12.65
99
18+18+20+25+71
12.56
99
1.29
1.29
1.43
1.79
18+18+20+25+42
12.82
99
18+18+20+25+50
12.78
99
1.48
1.48
1.64
2.05
18+18+20+25+25
12.91
99
18+18+20+25+35
12.91
99
1.72
1.72
1.91
2.38
18+18+20+22+60
12.65
99
18+18+20+22+71
12.56
99
1.32
1.32
1.46
1.61
4.30
1.20
1.20
1.33
1.66
4.72
3.45
1.39
1.39
1.54
1.93
3.85
2.38
1.57
1.57
1.74
2.18
3.05
4.39
1.22
1.22
1.36
1.49
4.81
18+18+20+42+50
13.53
99
18+18+20+42+60
12.56
99
1.24
1.24
1.38
2.89
18+18+20+35+71
12.56
99
18+18+20+42+42
12.74
99
1.12
1.12
1.25
2.18
18+18+20+35+50
12.78
99
18+18+20+35+60
12.65
99
1.29
1.29
1.43
2.51
18+18+20+35+35
12.91
99
18+18+20+35+42
12.82
99
1.44
1.44
1.60
2.81
2.81
1.37
1.37
1.52
2.66
3.19
3.45
1.15
1.15
1.28
2.68
3.84
4.43
1.30
1.30
1.44
3.03
3.03
3.58
1.20
1.20
1.34
2.34
4.01
18+18+22+22+42
13.44
99
18+18+22+22+50
13.39
99
1.50
1.50
1.84
1.84
18+18+22+22+25
13.53
99
18+18+22+22+35
13.53
99
1.75
1.75
2.14
2.14
18+18+20+50+60
12.52
99
18+18+22+22+22
13.53
99
1.10
1.10
1.22
3.04
18+18+20+42+71
12.47
99
18+18+20+50+50
12.65
99
1.08
1.08
1.20
2.51
2.43
1.60
1.60
1.95
1.95
3.10
3.65
1.80
1.80
2.20
2.20
2.20
4.24
1.17
1.17
1.29
3.24
3.24
3.51
1.41
1.41
1.73
1.73
3.92
18+18+22+22+60
13.26
99
18+18+22+22+71
13.18
99
1.31
1.31
1.60
1.60
4.37
1.22
1.22
1.49
1.49
4.80
110/216
OBH723B_COMBINATION
Содержание MXZ-2E53VAHZ
Страница 16: ...16 MXZ 4E83VA Unit mm Air in Air in Air in Air out OBH723C ...
Страница 17: ...17 MXZ 5E102VA Unit mm Air in Air in Air in Air out OBH723C ...
Страница 18: ...18 Unit mm MXZ 2E53VAHZ OBH723C ...
Страница 19: ...19 MXZ 4E83VAHZ Unit mm OBH723C ...
Страница 22: ...22 MXZ 4E83VA E1 OBH723C ...
Страница 23: ...23 MXZ 4E83VA E2 OBH723C ...
Страница 24: ...24 MXZ 4E83VA ET1 OBH723C ...
Страница 25: ...25 MXZ 4E83VA ET2 OBH723C ...
Страница 26: ...26 MXZ 4E83VA ER1 OBH723C ...
Страница 27: ...27 MXZ 5E102VA E1 OBH723C ...
Страница 28: ...28 MXZ 5E102VA E2 OBH723C ...
Страница 29: ...29 MXZ 5E102VA ET1 OBH723C ...
Страница 30: ...30 MXZ 5E102VA ET2 OBH723C ...
Страница 31: ...31 MXZ 5E102VA ER1 OBH723C ...
Страница 32: ...32 MXZ 2E53VAHZ E1 OBH723C ...
Страница 33: ...33 MXZ 2E53VAHZ ER1 OBH723C ...
Страница 34: ...34 MXZ 4E83VAHZ E1 OBH723C ...
Страница 35: ...35 MXZ 4E83VAHZ ER1 OBH723C ...