13-3. MUZ-AP71VG
NOTE:
Turn OFF the power supply before disassembly.
OPERATING PROCEDURE
PHOTOS/FIGURES
1. Removing the cabinet
(1) Remove the screws of the service panel.
(2) Remove the screws of the top panel.
(3) Remove the screw of the valve cover.
(4) Remove the service panel.
(5) Remove the top panel.
(6) Remove the valve cover.
(7) Disconnect the power supply and indoor/outdoor connect-
ing wire.
(8) Remove the screws of the cabinet.
(9) Remove the cabinet.
(10) Remove the screws of the back panel.
(11) Remove the back panel.
Photo 2
Photo 1
70
Screws of
the cabinet
Screws of the top panel
Screws of
the cabinet
Screws of the top panel
Screw of the back panel
Screws of
the cabinet
Screws of
the service panel
Screw of
the valve cover
Screws of
the cabinet
Screws of
the back panel
OBH789A
Содержание MUZ-AP25VG
Страница 12: ...12 Unit mm MUZ AP50VG MUZ AP60VG MUZ AP50VGH MUZ AP50VG H MUZ AP60VG OBH789A ...
Страница 15: ...15 MUZ AP42VG E1 ET1 E2 ET2 ER2 MUZ AP42VGH E1 E2 OBH789A ...
Страница 16: ...16 MUZ AP50VG E1 ET1 MUZ AP50VGH E1 OBH789A ...
Страница 17: ...17 MUZ AP60VG E1 ET1 MUZ AP71VG E1 ET1 OBH789A ...
Страница 76: ......